11 January - Three U S Air Force test pilots in a simulated seven- day lunar landing mission - Three U. S. Air Force test pilots began a five-week training period at the Martin Company leading to their participation in a simulated seven- day lunar landing mission. This was part of Martin's year-long study of crew performance during simulated A...
|
|
|
|
|
15 January - First Apollo fuel cell delivered by Pratt and Whitney - The first fuel cell module delivered by Pratt and Whitney Aircraft to North American was started and put on load. The module operated normally and all test objectives were accomplished. Total operating time was four hours six minutes, with one hour a...
|
|
|
|
|
15 January - Plans for testing the Apollo heatshield under reentry conditions - MSC and Bellcomm agreed upon a plan for testing the Apollo heatshield under reentry conditions. Following Project Fire and Scout tests, the Saturn IB would be used to launch standard "all-up" spacecraft into an elliptical orbit; the SM engi...
|
|
|
|
|
1964 January 16-February 12 - First full-throttle firing of STL Apollo LEM descent engine - The first full-throttle firing of Space Technology Laboratories' LEM descent engine (being developed as a parallel effort to the Rocketdyne engine) was carried out. The test lasted 214 seconds, with chamber pressures from 66.2 to 6.9 newtons per squa...
|
|
|
|
|
19 January - George M Low assigned to the position of Deputy Director of MSC - NASA assigned George M. Low to the position of Deputy Director of MSC. He would replace James C. Elms, who had resigned on January 17 to return to private industry. Although Low continued as Deputy Associate Administrator for Manned Space Flight at N...
|
|
|
|
|
21 January - North American design concept for the Apollo Block II - North American gave a presentation at MSC on the block change concept with emphasis on Block II CSM changes. These were defined as modifications necessary for compatibility with the LEM, structural changes to reduce weight or improve CSM center of gr...
|
|
|
|
|
22 January - North American began deployment flights of the full-scale test vehicle for the Paraglider Landing System Program. - The contract called for 20 tests to demonstrate deployment of the full-scale wing from the rendezvous and recovery can, followed by glide and radio-controlled maneuvering; each test was to be terminated by release of the wing and recovery by the emer...
|
|
|
|
|
|
23 January - Military Soviet on cosmonaut assignments - The General Staff of the VVS considers future cosmonaut assignments. The acceptance of Beregovoi into the active cosmonaut corps is hotly contested. He has passed all the tests, but is 43 years old, and the official maximum age for a cosmonaut is 35....
|
|
|
|
|
27 January - Cosmonaut plans - Marshall Rudenko questions Kamanin's crew assignments. He wants Volynov moved from the lead Vostok group and switched with Kolodin in the Soyuz group....
|
|
|
|
28 January - Agreement on space tracking station west of Madrid. - The United States and Spain agreed to the construction and operation of a $1.5 million space tracking and data acquisition station about 48 kilometers (30 miles) west of Madrid, Spain. Linked with the NASA Deep Space Instrumentation Facility, the sta...
|
|
|
|
|
29 January - Saturn 5 - First first mission of Block II Saturn with two live stages. SA-5, a vehicle development flight, was launched from Cape Kennedy Complex 37B at 11:25:01.41, e.s.t. This was the first flight of the Saturn I Block II configuration (i.e., lengthened fuel...
|
|
|
|
|
29 January - Contract for Apollo tracking antennae - NASA announced the award of a $1.356 million contract to the Blaw-Knox Company for design and construction of three parabolic antennas, each 26 meters (85 feet) in diameter, for the Manned Space Flight Network stations at Goldstone, Calif.; Canberra,...
|
|
|
|
|
30 January - Ranger 6 - Impacted Moon but TV camera malfunctioned. A midcourse trajectory correction was accomplished early in the flight by ground control. On February 2, 1964, 65.5 hours after launch, Ranger 6 impacted the Moon on the eastern edge of Mare Tranquillitatis ...
|
|
|
|
|
|
1 February - Korolev's plans - Korolev is supporting establishment of a new institute, the IMBP, for study of biological reactions to spaceflight. He plans to complete 8 additional Vostok capsules, of which two or three will be used for unmanned life sciences missions. There is co...
|
|
|
|
|
5 February - Soyuz mock-up - The cosmonauts visit Korolev at OKB-1 for the first viewing of the mock-up of the Soyuz spacecraft. Korolev announces that single-place Vostoks will fly no more, and that instead four of the spacecraft will be completed during 1964 to take three crew...
|
|
|
|
10 February - Grumman to stop all work on the Apollo LEM Little Joe II program - MSC directed Grumman to stop all work on the LEM Little Joe II program. This action followed the ASPO Manager's decision against a testing program for the LEM comparable to that for the CSM....
|
|
|
|
|
11 February - Apollo LEM to use an inertial reference system - ASPO directed Grumman to provide an abort guidance system (AGS) in the LEM using an inertial reference system attached to the structure of the vehicle. Should the spacecraft's navigation and guidance system fail, the crew could use the AGS to effect ...
|
|
|
|
|
|
12 February - Kremlin meeting on lunar landing plans - VVS officers meet with O G Ivanovskiy for two hours. The Communist Party plans a lunar expedition in the 1968-1970 period. For this the N1 booster will be used, which has a low earth orbit payload of 72 tonnes. The minimum spacecraft to take a crew ...
|
|
|
|
13 February - Studies on post-Apollo lunar exploration - MSC issued Requests for Proposals to more than 50 firms asking for studies and recommendations on how the lunar surface should be explored. Studies should show how lunar surveys could be performed and how points on the lunar surface might be located ...
|
|
|
|
|
14 February - Apollo SM RCS to have emergency deorbit capability - MSC ordered North American to design the SM's reaction control system with the capability for emergency retrograde from earth orbit....
|
|
|
|
|
1964 February 16-March 21 - Grumman subcontracts for engines for the Apollo LEM - MSC gave its formal consent to two of Grumman's subcontracts for engines for the LEM: (1) With Bell Aerosystems for the ascent engine ($11,205,416 incentive-fee contract) (2) With Space Technology Laboratories for a descent engine to parallel that be...
|
|
|
|
|
1964 February 19-20 - Acceptance testing of prototype Apollo space suit - MSC officials conducted acceptance testing of the 024 prototype space suit at the International Latex Corporation. (Reviewers identified several faults, but they were minor and the suit was accepted.)...
|
|
|
|
|
20 February - All 12 Gemini flights to end in water landings. - George E. Mueller, NASA Associate Administrator for Manned Space Flight, informed the staff of the Gemini Project Office (GPO) that all 12 Gemini flights would end in water landings, although Project Gemini Quarterly Report No. 8 for the period endin...
|
|
|
|
|
26 February - Lockheed recommendations on a scientific space station program. - The Lockheed-California Company released details of its recommendations to MSC on a scientific space station program. The study concluded that a manned station with a crew of 24 could be orbiting the Earth in 1968. Total cost of the program including...
|
|
|
|
|
|
26 February - Soyuz plans - The cosmonauts meet with engineers at TsNII-30 in Noginsk to review plans for docking trainers for the new Soyuz spacecraft. The trainers were supposed to be completed by now, but they are being held up for television and optical equipment to be deli...
|
|
|
|
27 February - Apollo boilerplate (BP) 19 drop tested - Boilerplate (BP) 19 was drop tested at El Centro, Calif., simulating flight conditions and recovery of BP-12. A second BP-19 drop, on April 8, removed all constraints on the BP-12 configuration and earth landing system. Another aim, to obtain informa...
|
|
|
|
|
12 March - Apollo LEM propulsion as backup to the SM engine - North American was directed by NASA to study feasibility of using the LEM propulsion system as backup to the SM propulsion system. The most important item in the contractor's analysis was strength of the docking structure and its ability to withstand...
|
|
|
|
|
|
13 March - Voskhod spacecraft approved. - Military-Industrial Commission (VPK) Decree 59 'On approval of work to convert Vostok to Voskhod and use it for three-person space missions' is issued. The resolution instructs GKOT to complete four Vostok spacecraft to the multi-passenger Voskhod co...
|
|
|
|
|
14 March - Voskhod plans - VVS officers meet to plan training for the Voskhod 1 crew. It is agreed that a passenger-cosmonaut can be trained within three months. That means, in order to be ready for an August mission, the candidates for the scientist- and physician-cosmonaut s...
|
|
|
|
1964 March 16-April 15 - First prototype of the Apollo CM reentry battery was delivered - The first prototype of the CM battery for use during reentry was delivered to North American by Eagle-Picher Industries, Inc....
|
|
|
|
|
|
21 March - Luna failure - The upper stages burnt on re-entry into the atmosphere....
|
|
|
|
23 March - Apollo missions defined - OMSF outlined launch vehicle development, spacecraft development, and crew performance demonstration missions, using the Saturn IB and Saturn V:...
|
|
|
|
|
1964 March 24-26 - Apollo LEM mockup TM-1 inspection and review - The first formal inspection and review of the LEM test mockup TM-1 was held at Grumman. TM-1 allowed early assessment of crew mobility, ingress, and egress. It was a full-size representation of crew stations, support and restraint systems, cabin equi...
|
|
|
|
|
25 March - Boeing to develop the Lunar Orbiter spacecraft - The Boeing Company received NASA's go-ahead to develop the Lunar Orbiter spacecraft. Two significant changes were made in the original Statement of Work:...
|
|
|
|
|
26 March - Boilerplate spacecraft No. 4 was subjected to its first drop from a test rig. - The boilerplate achieved a horizontal velocity of 60 feet per second and a vertical velocity of about 40 feet per second at the time of impact with the water. The test was conducted to obtain data on landing accelerations for various speeds and attit...
|
|
|
|
|
30 March - Contract for production of 76 F-1 engines - MSFC awarded Rocketdyne a definitive contract (valued at $158.4 million) for the production of 76 F-1 engines for the first stage of the Saturn V launch vehicle and for delivery of ground support equipment....
|
|
|
|
|
1 April - Contract for 27 prototype Apollo space suits - MSC negotiated a cost-plus-incentive-fee contract, valued at $1.65 million, with Hamilton Standard for 27 prototype Apollo space suits and 12 pairs of gloves....
|
|
|
|
|
1964 April - Rotating manned orbital research laboratory for a Saturn V launch vehicle. - A study to recommend, define, and substantiate a logical approach for establishing a rotating manned orbital research laboratory for a Saturn V launch vehicle was made for MSC. The study was performed by the Lockheed-California Company, Burbank, Cali...
|
|
|
|
|
1964 April 2-9 - Static firing of the Apollo LEM descent engine - Space Technology Laboratories (STL) began using its new San Juan Capistrano, Calif., test facility to static fire the firm's LEM descent engine. Hereafter, the bulk of STL's development firings were made at this site....
|
|
|
|
|
7 April - First of two Apollo lunar landing research vehicles completed - Bell Aerosystems Company completed the first of two lunar landing research vehicles, to be delivered to the NASA Flight Research Center for testing....
|
|
|
|
|
8 April - Gemini 1 - The first Gemini mission, ...
|
|
|
|
|
|
13 April - Construction of nine Voskhod spacecraft approved. - Central Committee of the Communist Party and Council of Soviet Ministers Decree 'On approval of work on four Voskhods and five EVA-equipped Vykhods' was issued. Work on the 3KV (three crew) and 3KD (two crew plus inflatable airlock) versions of the b...
|
|
|
|
14 April - Phase I tests of the Apollo SM engine completed - Firings at the Arnold Engineering Development Center (AEDC) and at Aerojet-General Corporation's Sacramento test site completed Phase I development tests of the SM propulsion engine. The last simulated altitude test at AEDC was a sustained burn of 63...
|
|
|
|
|
14 April - FIRE 1 - FIRE was a subscale model of the Apollo capsule used to verify the spacecraft's hypersonic flight and thermal characteristics. An Atlas D launch vehicle lifted a Project Fire spacecraft from Cape Kennedy in the first test of the heat that would be en...
|
|
|
|
|
1964 April 15-16 - Demonstration of space suits using the LEM TM-1 mockup - MSC Crew Systems Division representatives attended a demonstration at Grumman of Apollo Phase B and Gemini space suits using the LEM TM-1 mockup and a mockup portable life support system. Tests demonstrated ingress egress capability through the forwa...
|
|
|
|
|
16 April - Apollo scientist-astronaut program planned - NASA's Office of Space Science and Applications (OSSA) and the National Academy of Sciences (NAS) were planning a scientist-astronaut program. The screening-for-selection process could be scheduled for February 1965....
|
|
|
|
|
16 April - Apollo changes for Block II - Joseph F. Shea, ASPO Manager, in a letter to North American's Apollo Program Manager, summarized MSC's review of the weight status of the Block I and the design changes projected for Block II CSM's. ...
|
|
|
|
|
17 April - Manned Apollo LEM drop tests - Grumman conducted manned drop tests to determine the LEM crew's ability to land the spacecraft from a standing position. All tests were run with the subject in an unpressurized suit in a "hands off" standing position with no restraint syste...
|
|
|
|
|
|
20 April - Luna failure - The upper stages broke up on re-entry into the atmosphere.....
|
|
|
|
20 April - IBM to build the instrument units for the Saturn launch vehicles - NASA selected IBM, Federal Systems Division, to develop and build the instrument units (IU) for the Saturn IB and Saturn V launch vehicles. (IBM had been chosen by NASA in October 1963 to design and build the IU data adapters and digital guidance com...
|
|
|
|
|
1964 April 23-30 - First firing of a prototype thrust chamber for Apollo LEM descent engine - Rocketdyne conducted the first firing of the prototype thrust chamber assembly for its LEM descent engine....
|
|
|
|
|
24 April - Apollo scientific experiments program - The NASA Manned Space Science Division was planning a scientific experiments program for manned and unmanned earth orbital flights. The manned program would be a direct outgrowth of the Gemini experiments program....
|
|
|
|
|
24 April - Deletion of the Apollo LEM's front docking capability - Representatives from a number of elements within MSC (including systems and structural engineers, advanced systems and rendezvous experts, and two astronauts, Edward H. White II and Elliot M. See, Jr.) discussed the idea of deleting the LEM's front d...
|
|
|
|
|
|
24 April - Voskhod plans - Kamanin receives the directive issued by Biryuzov to implement the Voskhod Party resolutions. Four spacecraft will be completed, two in a three-man configuration, to be flown in the second half of 1964, and two in a configuration that will provide a...
|
|
|
|
30 April - First Agena D for the Gemini program. - Air Force Space Systems Division (SSD) accepted the first Agena D (AD-71) for the Gemini program. The Agena D was a production-line vehicle procured from Lockheed by SSD for NASA through routine procedures. Following minor retrofit operations, the ve...
|
|
|
|
|
|
7 May - Voskhod showdown - Korolev meets with the cosmonauts, VVS, and RVSN staff to discuss concerns as to the safety of Voskhod. As for flying without spacesuits, Korolev points out than in 14 Zenit-2/Zenit-4 and 10 Vostok flights there has not been a single instance of loss...
|
|
|
|
|
12 May - Korolev's plans - While Kamanin is away arranging screening of Voskhod candidates, Korolev meets with the VVS General Staff. He tells them he wants to have four Voskhods completed by the anniversary of the October Resolution for the first spacewalk. He dreams of a man...
|
|
|
|
28 May - Saturn 6 - Apollo Saturn Mission A-101, using CM BP-13 atop SA-6 Saturn I launch vehicle, launched at Cape Kennedy, Fla., to prove spacecraft/launch vehicle compatibility. Boilerplate CSM, LM adapter, LES. LES jettison demonstrated....
|
|
|
|
|
|
29 May - Voskhod passenger candidates - Following final review, the General Staff ordered Lazarev, Yegorov, Polyakov, Sorokin, and Katys to enter training for flight aboard the Voskhod spacecraft....
|
|
|
|
|
4 June - Voskhod technical review - Korolev presents the Voskhod technical design to organisations outside of OKB-1. Over 27 VVS representatives, including 10 cosmonauts, attend. The two Vostok variants have been dubbed 3KV (3-crew version) and 3KD (2 crew version with airlock). Korole...
|
|
|
|
|
14 June - Voskhod development approved. - Decree 'On approval of work on Voskhod and Vykhod' was issued....
|
|
|
|
|
19 June - R-56 super booster canceled. - Decree 'On termination of work on the R-56 launch vehicle and on schedule of the testing for the N1' was issued....
|
|
|
|
|
6 July - Voskhod crews selected. - Kamanin select Volynov, Katys, and Yegorov as the prime crew for the Voskhod flight. Komarov, Feoktistov, and Sorokin will be the backup crew. Lazarev will serve as reserve for both crew physician position. The VVS leadership approves the selection. ...
|
|
|
|
|
19 July - Korolev obtains preliminary approval for a single-launch, lunar orbit rendezvous, manned landing. - Work on the original N1-L3 had begun in 1963. This had been preceded by two years of working on a draft project for the LK lunar lander and its propulsion system. But there was no money for full scale development -- no code name from Gosplan against ...
|
|
|
|
|
21 July - Korolev's single-launch lunar scheme reviewed by the Chief Designers - How to achieve the additional N1 payload was a key point of discussion....
|
|
|
|
|
24 July - Voskhod flight slips - Crew training is proceeding normally and the crews will be ready by the scheduled 1 August date. On the other hand the date for launch of the first manned mission has slipped from 15 August well into September. ...
|
|
|
|
28 July - Ranger 7 - First successful Ranger; returned 4,308 photos before lunar impact. The Atlas- Agena B inserted the Agena and Ranger into a 192 km altitude Earth parking orbit. Half an hour after launch a second burn of the Agena engine injected the spacecraft into ...
|
|
|
|
|
|
1 August - Full scale development of Soviet manned lunar flyby and landing projects authorised. - Central Committee of the Communist Party and Council of Soviet Ministers Decree 655-268 'On Work on the Exploration of the Moon and Mastery of Space--piloted LK-1 circumlunar and L3 lunar landing projects and the Ye-6M lunar lander' was issued. Chelo...
|
|
|
|
|
12 August - Voskhod State Commission - The readiness of two crews is certified (the prime crew of Volynov, Katys, and Yegorov and backup crew of Komarov, Feoktistov, and Sorokin). Korolev presses for Feoktistov to be included in the prime crew, citing his unequalled technical knowledge o...
|
|
|
|
|
15 August - Chief Designers review of Voskhod at OKB-1 - All concerned designers, bureaux, and institutes certify the reliability of the systems of the spacecraft and launch vehicle. The second phase of trials of the soft landing system have been successful. Of 10 drops, 9 landed with vertical velocity und...
|
|
|
|
|
21 August - VPK Meeting on Voskhod - The Military-Industrial Commission, following statements by the Chief Designers, sets the launch of the prototype Voskhod with mannequins for 5 September followed by the manned flight between 15 and 20 September....
|
|
|
|
|
31 August - Katys deleted from Voskhod prime crew. - It is discovered that Katys has a brother and sister living in Paris, a fact he did not disclose during the selection process. They left for Paris in 1910, 16 years before Katys was even born. But together with the fact that his father was executed b...
|
|
|
|
|
1 September - Construction start of N1 launch complex 110 east - ...
|
|
|
|
|
8 September - Crash at Fedosiya - A Voskhod capsule is finally dropped from 10 km altitude in order to test the parachute hatch ejection mechanism. The hatch fails to deploy, the parachute never opens, and the capsule crashes to earth. Korolev claims the test capsule's electrical sch...
|
|
|
|
|
9 September - Voskhod preparations - Kamanin arrives at the cosmodrome, only to find the launch of the manned Voskhod delayed to October. The launch of a Zenit-4 spy satellite, that uses the same launch vehicle as planned for Voskhod, has aborted on the pad after the Block A strap-on fa...
|
|
|
|
|
13 September - Cosmos 45 - High resolution photo reconnaissance satellite; returned film capsule; also carried weather experiments. The Zenit-4 launches a day ahead of schedule. The booster rocket performs perfectly as Korolev and Kamanin watch from the veranda of the IP-1 tra...
|
|
|
|
|
14 September - Voskhod abort system - Kamanin reviews the Voskhod abort system with Korolev. Up to T+27 seconds, there is no possibility of saving the crew in the event of a booster failure; from T+27 seconds to T+44 seconds, escape would be difficult, but is possible; and from T+44 seco...
|
|
|
|
18 September - Saturn 7 - Apollo systems test. Third orbital test. First closed-loop guidance test....
|
|
|
|
|
18 September - Apollo Mission A-102 / SA-7 - Apollo Mission A-102, using BP-15 for the command and service modules (CSM) and SA-7 for the launch vehicle, confirmed Saturn Block II and CSM compatibility as well as the launch escape vehicle system....
|
|
|
|
|
|
18 September - Voskhod State Commission - The State Commission meets at Baikonur. Chertok advises that the failure of the parachute hatch to jettison in the trials in Fedosiya was due to a serious defect in the schematics of the electrical layout and will not occur again. Korolev declares he...
|
|
|
|
|
24 September - Khrushchev visits Baikonur - This was his last visit, just weeks before his overthrow. The Soviet leadership were shown the UR-100 and observed launches of the competing UR-200 and R-36. Khrushchev agreed with the decision to put the R-36 into production instead of Chelomei’s UR...
|
|
|
|
|
29 September - Voskhod launch preparations - Kamanin meets Korolev at the MIK assembly building at 09:30. Korolev is preoccupied - his wife is in the Kremlin hospital, scheduled for surgery on 1 October. It is a dangerous diversion when all his powers and concentration need to be devoted to cl...
|
|
|
|
30 September - Formal inspection of Block II Apollo CSM mockup - NAA conducted formal inspection and review of Block II CSM mockup....
|
|
|
|
|
|
2 October - Voskhod slips again - The mannequin launch is now set for 6-8 October, and the manned launch to 12-14 October. Kamanin is looking forward to Korolev's return to Baikonur in order to confront him over the crew selection. ...
|
|
|
|
|
3 October - Voskhod integration problems - Work on completing the spacecraft is finally on schedule, but then it is found that there is a failure in the Signal device, which provides communications after the separation of the capsule from the equipment section after retrofire. Nevertheless it...
|
|
|
|
|
6 October - Cosmos 47 - Unmanned test of Voskhod spacecraft. At 07:00 the State Commission meets at Area 2. All Chief Designers, Commanders, and Section report that all is ready for flight. The commission gives the order to proceed with the launch. Weather at the pad is 7 b...
|
|
|
|
|
7 October - Cosmos 47 returns to earth. - At 7 am the Cosmos 47 landing commission convenes. Kamanin has had only three hours sleep. The spacecraft is to conduct retrofire on its 17th orbit of the earth and land in Kustan, where winds are 15-17 m/s. The capsule made a good landing, with the ...
|
|
|
|
1964 October 8-15 - Block I Apollo CM's heat rejection capability inadequate - Analysis by MSC of the performance of the environmental control system radiators for Block I CM's placed their heat rejection capability at 4,000 Btus per hr, far below the anticipated mission load of 7,220....
|
|
|
|
|
1964 October 9-17 - First major tests of the NASA worldwide tracking network were conducted in preparation for manned orbital flights in the Gemini program. - Simulated flight missions were carried out over nine days and invloved Goddard Space Flight Center, Mission Control Center at the Cape, and eight remote sites in the worldwide network to test tracking and communications equipment, as well as flight c...
|
|
|
|
|
9 October - Weight reduction program for the Apollo LEM - NASA and Grumman representatives discussed a weight reduction program for the LEM. Changes approved at the M-5 mockup review portended an increase in LEM separation weight of from 68 to 453 kg (150 to 1,000 lbs). Both parties agreed to evaluate the a...
|
|
|
|
|
|
10 October - Voskhod-1 State Commission - Kosberg testifies that the problem that led to the engine explosion on the test stand was due to the stand itself and would not occur with a flight engine. Korolev agrees, and recommends launch based on the successful flight record of the engine, the...
|
|
|
|
|
12 October - Voskhod 1 - The U.S.S.R. launched the world's first multi-manned spacecraft, ...
|
|
|
|
|
12 October - Almaz project starts - The day before the overthrow of his patron, Chelomei obtained permission to begin development of a larger military space station, the Almaz. This 20 tonne station would take three cosmonauts to orbit in a single launch of his UR-500K Proton rocket. T...
|
|
|
|
|
13 October - Khrushchev ousted from power. - Brezhnev faction assumes control of Politubro. Brezhnev was adverse to all projects Khrushchev had supported. These included those of Chelomei and his OKB-52....
|
|
|
|
|
13 October - Landing of Voskhod 1 - The world's first recovery of an orbital spacecraft with its crew aboard on land was made possible by rocket package suspended above capsule in parachute lines, which ignited just prior to impact in order to cushion landing. The trio landed after 16...
|
|
|
|
14 October - Qualification testing of the reentry batteries for the Apollo CM - Eagle-Picher Company completed qualification testing on the 25-amperehour reentry batteries for the CM. Shortly thereafter, Eagle-Picher received authorization from North American to proceed with design and development of the larger 40-ampere-hour ba...
|
|
|
|
|
14 October - First Apollo guidance system shipped - In a letter to NASA Administrator James E. Webb, AC Spark Plug reported that the first Apollo guidance system completed acceptance testing and was shipped at 11:30 p.m. and arrived at Downey, California, early the following day. AC reported that in m...
|
|
|
|
|
1964 October 16-November 15 - Three Apollo fuel cells operated in a simulated space vacuum - Three Pratt and Whitney fuel cells were operated in a simulated space vacuum at North American for 19, 20, and 21 hours. This was the first time three cells were operated as an electrical power generating subsystem....
|
|
|
|
|
17 October - IBM contract for the Apollo backup computer - MSC and International Business Machines Corporation (IBM) negotiated a $1,500,000 fixed-price contract for the Apollo guidance and navigation system backup computer....
|
|
|
|
|
19 October - Work stopped on Apollo LTA 10 - MSC ordered Grumman to halt work on the LEM test article (LTA) 10. The LTA-10's descent stage would be replaced with one cannibalized from LEM test mockup 5....
|
|
|
|
|
|
19 October - Voskhod 1 crew in Moscow - The crew arrives at Vnukovo Airfield at 12:30 aboard an Il-18. The crew walks up to the reviewing stand and Komarov makes the standard report to the Communist Party and Soviet Ministers. At 14:00 there is a meeting at Red Square, and at 17:00 an audi...
|
|
|
|
|
20 October - Cosmonaut meeting at OKB-1 - The traditional meeting with the crew is followed by a smaller group in Korolev's office. Numerous toasts are drunk to the crew, to future victories in space, and... "on to the moon". From 18:00 to 20:00 the cosmonauts are prepared by Keldysh, Tyulin...
|
|
|
|
1964 October 22-29 - Use of Gemini suits in Apollo Block I missions studied - MSC's Crew Systems Division investigated environmental control system (ECS) implications of using Gemini suits in Block I missions. The results indicated that the ECS was capable of maintaining nominal cabin temperature and carbon dioxide partial pre...
|
|
|
|
|
23 October - Surveyor Block II study related to the Apollo landing aid problem - Jet Propulsion Laboratory proposed a meeting on October 29 between representatives of NASA Headquarters, Bellcomm, MSC, MIT, and JPL to present the requirements and status of projects underway as they related to the landing aid problem. The Surveyor ...
|
|
|
|
|
27 October - Samuel C Phillips named Director of Apollo Program - NASA announced the appointment of Major General Samuel C. Phillips as Director of the Apollo Program. Phillips thus assumed part of the duties of George E. Mueller, Associate Administrator of Manned Space Flight, who had been serving as Apollo Direct...
|
|
|
|
|
|
28 October - Lunar project orders issued to industry. - Military-Industrial Commission (VPK) Decree 'On assignment of lunar programs to OKB-52 and OKB-1' was issued....
|
|
|
|
28 October - Apollo mission programming - ASPO's Operations Planning Division defined the current Apollo mission programming as envisioned by MSC. The overall Apollo flight program was described in terms of its major phases: Little Joe II flights (unmanned Little Joe II development and launc...
|
|
|
|
|
28 October - Testing of the first flight-weight Apollo LEM fuel cell - Testing of the first flight-weight 15-cell stack of the LEM fuel cell assembly began. Although the voltage was three percent below design, the unit had a 980-watt capability. Earlier, the unit completed 150 hours of operation, and single cell life ha...
|
|
|
|
|
1964 October 29-November 5 - Frst operational deployment of the launch escape system canards - North American conducted the first operational deployment of the launch escape system canards. No problems were encountered with the wiring or the mechanism. Two more operational tests remained to complete the minimum airworthiness test program, a co...
|
|
|
|
|
1964 October 29-November 5 - Apollo hard shell meteoroid garment - The MSC Meteoroid Technology Branch inspected a hard shell meteoroid garment built by the Center's Crew Systems Division. It was only a crude prototype, yet it in no way hampered mobility of the pressurized suit. The Meteoroid Technology people were ...
|
|
|
|
|
30 October - First drop test of boilerplate 28 - North American conducted the first drop test of boilerplate 28 at Downey, Calif. The test simulated the worst conditions that were anticipated in a three-parachute descent and water landing. The second drop, it was expected, would likewise simulate a...
|
|
|
|
|
|
31 October - UR-700 project cancelled - Following the August decree that gave the circumlunar project to Chelomei and the lunar landing project to Korolev, further work on development of the UR-700 by Chelomei was cancelled. However development of the RD-270 engine was continued and Chelom...
|
|
|
|
31 October - Astronaut Theodore C Freeman died in an aircraft accident - Astronaut Theodore C. Freeman died in an aircraft accident at Ellington Air Force Base, near Houston. Freeman, an Air Force captain and a member of NASA's third group of spacemen, was preparing to land his T-38 training jet when it struck a goose and...
|
|
|
|
|
|
November 1964 - Korolev's admits that N1 cannot attain payload needed for single-launch mission - Korolev speaks privately to Chertok. Kozlov has told him it will be impossible to build an N1 with the 93 tonne payload capability until the fourth flight article. The L3 concept was still the same as in the August decree - 2 cosmonauts aboard the LO...
|
|
|
|
5 November - Apollo Space Suit designated Extravehicular Mobility Unit - The Apollo Space Suit Assembly received a new designation, the Apollo Extravehicular Mobility Unit. The purpose of the change was to make it more descriptive of its function in the Apollo mission....
|
|
|
|
|
1964 November 5-12 - During 20-g loading test Apollo CM aft heatshield failed - During a mechanical loading test (simulating a 20-g reentry) the CM aft heatshield failed at 120 percent of maximum load. Structures and Mechanics Division engineers inspected the structure. They found that the inner skin had buckled, the damage exte...
|
|
|
|
|
6 November - All major Apollo LEM subcontracts issued - ...
|
|
|
|
|
6 November - Significant milestones for the Apollo LEM planned - NASA anticipated five significant milestones for the LEM during the forthcoming year:...
|
|
|
|
|
10 November - First firing of the service propulsion system engine - Joseph G. Thibodaux, Jr., MSC Propulsion and Power Division, reported at an Apollo Engineering and Development technical management meeting that the first J-2 firing of the service propulsion system engine was conducted at White Sands Missile Range (...
|
|
|
|
|
|
11 November - Development of the manned circumlunar spacecraft LK-1 authorised - ...
|
|
|
|
1964 November 12-19 - Lump considered for the Apollo CM's blunt face - In its search for some method of reducing water impact pressures, North American was considering adding a 15- to 30.5-cm (6- to 12-in) "lump" to the CM's blunt face. The spacecraft manufacturer was also investigating such consequent factors...
|
|
|
|
|
1964 November 12-19 - Program to resize the Apollo LEM - MSC analyzed Grumman's report on their program to resize the LEM. On the basis of this information, ASPO recommended that the propellant tanks be resized for separation and lunar liftoff weights of 14,742 and 4,908 kg (32,500 and 10,820 lbs), respect...
|
|
|
|
|
|
November 1964 - No direction on space from new Soviet leadership. - After the triumph of the Voskhod-1 flight, Korolev gathers a group of his closest associates in his small office - Chertok, Bushuyev, Okhapkin, and Turkov. Firm plans do not exist yet for further manned spaceflights. Following the traditional Kremlin...
|
|
|
|
16 November - Apollo LLRV first successful flight - NASA test pilot Joseph A. Walker flew the LLRV for the second time. The first attempted liftoff, into a 9.26-km (5-nm) breeze, was stopped because of excessive drift to the rear. The vehicle was then turned to head downwind and liftoff was accomplish...
|
|
|
|
|
23 November - Formal go-ahead on the Apollo Block II spacecraft - North American received NASA's formal go-ahead on manufacture of the Block II spacecraft....
|
|
|
|
|
1964 November - Six flights of the Apollo Lunar Landing Research Vehicle - Six flights of the Lunar Landing Research Vehicle (LLRV) were made during the month, bringing the total number to seven. The project pilot, Joseph Walker, made all flights and demonstrated a rapid increase in the ease and skill with which he handled ...
|
|
|
|
|
1964 December 3-10 - Plans for mockups of the Block II Apollo CSM - MSC approved plans put forth by North American for mockups of the Block II CSM. For the crew compartment mockup, the company proposed using the metal shell that had originally been planned as a simulator. Except for the transfer tunnel and lighting, ...
|
|
|
|
|
4 December - Battleship S-IVB second stage static-fired - At its Sacramento test site, Douglas Aircraft Company static-fired a "battleship" S-IVB second stage of the Saturn IB vehicle, for 10 sec. (A battleship rocket stage was roughly the vehicle's equivalent to a boilerplate spacecraft.) On Janu...
|
|
|
|
|
7 December - First S-IVB stage delivered for testing - Douglas Aircraft Company delivered the first S-IVB stage to Marshall Space Flight Center for extensive vibration, bending, and torsional testing. The stage was not an actual flight stage and contained mockups of the engine and other components, but i...
|
|
|
|
|
8 December - Apollo main parachute drop-tested - A single main parachute was drop-tested at El Centro, Calif., to verify the ultimate strength. The parachute was designed for a disreef load of 11,703 kg (25,800 lbs) and a 1.35 safety factor. The test conditions were to achieve a disreef load of 15,...
|
|
|
|
|
8 December - A-002 / BP-23 Spacecraft Test mission - Boilerplate 23, Mission A-002, was successfully launched from WSMR by a Little Joe II launch vehicle. The test was to demonstrate satisfactory launch escape vehicle performance utilizing the canard subsystem and boost protective cover, and to verify ...
|
|
|
|
|
11 December - Apollo LEM abort guidance section - MSC directed Grummann to provide a LEM abort guidance section (AGS) having...
|
|
|
|
|
16 December - First test of Apollo fecal canister and urine relief tube under zero-g conditions - Aboard a KC-135 from Wright-Patterson AFB, the fecal canister and urine relief tube were first tested under zero-g conditions. Similar manned tests of a complete unit were scheduled for February 1965....
|
|
|
|
|
1964 December 16-January 15 - Phase II Apollo service propulsion system engine tests begun - Phase II service propulsion system engine tests at Arnold Engineering Development Center were begun under simulated high altitude conditions with a successful first firing of 30 seconds. A total of nine firings were completed....
|
|
|
|
|
18 December - North American delivered Apollo CM 001 - North American delivered spacecraft 001's CM to White Sands. The SM was shipped several days later, and would be used for propulsion engine development. Aerojet-General shipped the service propulsion engine to the facility on January 6, 1965....
|
|
|
|
|
29 December - Lunar Sample Receiving Laboratory mission defined - The Lunar Sample Receiving Laboratory, currently being planned for construction at MSC, would support - in addition to its vital role as a quarantine area - two important activities:...
|
|
|
|
|
1964 - During the last quarter - Use of modified Gemini space suits for Block I Apollo - Crew Systems Division approved the use of modified Gemini space suits in Block I Apollo spacecraft. MSC and David Clark Company amended their Gemini suit contract to cover design and fabrication of a prototype Block I suit....
|
|
|
|
|
1964 - During the last quarter - Large-scale testing of the radiator for Apollo Block II CSM - Ling-Temco-Vought began large-scale developmental testing of the radiator for the Block II CSM environmental control system. One problem immediately apparent was the radiator's performance under extreme conditions....
|
|
|
|