Mir News 188: 2d Spacewalk (EVA) Mir-Crew home
1993 Sep 20 - Nation: Russia.
  • Mir News 188: 2d Spacewalk (EVA) Mir-Crew Program: Mir. Flight: Mir EO-14.

    Tsibliyev and Serebrov concluded the installation of the Rapan pillar during a relatively short EVA on 20.09.93 between 0352 and 0705 UTC, so 3 hrs and 13 mins. The Rapan is standing perpendicularly on the Kvant-1 module near the Sofora mast. The Sofora is standing under an angle of 79 degrees and inclines towards the forward side of the complex. The crew installed materials, samples and equipment on the Rapan for an exposure to open space during half a year. After this period the samples etc. have to be returned to earth for analyses.

    Eventual 3d EVA:

    After evaluation of today's EVA and an analysis of the TV-images made by the cosmonauts, experts will decide whether there will be needed a 3d EVA. The Russians did speak nor about the inspection of Mir's outer surface and the solar batteries neither about the transfer of solar batteries. If a 3d EVA will be made, this might be on 24.09.93.

    Chris v.d. Berg, NL-9165/A-UK3202.


Contact us with any corrections, additions, or comments.
Conditions for use of drawings, pictures, or other materials from this site..
To contact astronauts or cosmonauts.

© Mark Wade, 1997 - 2007 except where otherwise noted.