Encyclopedia Astronautica
ISS EO-24


ISS long-term residence mission. Crew: Yurchikhin; Wheelock; Walker, Shannon. Backup crew: Kondratiyev, Dmitry; Nespoli; Coleman.

AKA: Soyuz TMA-19; Olympus.
First Launch: 2010.06.15.
Duration: 163.30 days.

More... - Chronology...


Associated People
  • Borisenko Borisenko, Mikahil Ivanovich (1917-1984) Russian designer of missile radio control systems, 1946-1975 developed radio control systems for R-1, R-2, R-5, and R-7 missiles and satellites at the Moscow Scientific Research Radio Technical Institute (MPSS). Director of MPSS 1975-1984. More...
  • Skvortsov Skvortsov, Aleksandr Aleksandrovich (1942-) Russian pilot cosmonaut, 1965-1968. Father of cosmonaut Aleksandr Skvortsov, Jr. More...
  • Walker Walker, Charles David (1948-) American engineer payload specialist astronaut. Flew on STS-41-D, STS-51-D, STS-61-B. More...
  • Nespoli Nespoli, Paolo Alberto (1957-) Italian engineer mission specialist astronaut. Flew on STS-120, ISS EO-26. More...
  • Yurchikhin Yurchikhin, Fyodor Nikolayevich (1959-) Georgian-Russian engineer cosmonaut. Flew on STS-112, ISS EO-15,ISS EO-24. 373 cumulative days in space. Engineer, Energia NPO. More...
  • Wheelock Wheelock, Douglas Harry (1960-) American test pilot mission specialist astronaut. Flew on STS-120, ISS EO-24. US Army. More...
  • Coleman Coleman, Dr Catherine Grace 'Cady' (1960-) American materials scientist mission specialist astronaut. Flew on STS-73, STS-93, ISS EO-26. US Air Force engineer. More...
  • Walker, Shannon Walker, Shannon (1965-) American astrophysicist mission specialist astronaut, 2004-on. More...

See also
Associated Programs
  • ISS Finally completed in 2010 after a torturous 25-year development and production process, the International Space Station was originally conceived as the staging post for manned exploration of the solar systrem. Instead, it was seemed to be the death knell of manned spaceflight. More...

ISS EO-24 Chronology


2010 June 15 - . 21:35 GMT - . Launch Site: Baikonur. Launch Complex: Baikonur LC1. LV Family: R-7. Launch Vehicle: Soyuz FG. LV Configuration: Soyuz-FG s/n 1757.
  • Soyuz TMA-19 - . Call Sign: Olympus. Crew: Yurchikhin; Wheelock; Walker, Shannon. Backup Crew: Kondratiyev, Dmitry; Nespoli; Coleman. Payload: Soyuz 7K-STMA s/n 229. Mass: 7,200 kg (15,800 lb). Nation: Russia. Agency: RKA. Program: ISS. Class: Manned. Type: Manned spacecraft. Flight: ISS EO-24; ISS EO-23. Spacecraft: Soyuz TMA. Duration: 163.30 days. Decay Date: 2010-11-26 . USAF Sat Cat: 36603 . COSPAR: 2010-029A. Apogee: 361 km (224 mi). Perigee: 350 km (210 mi). Inclination: 51.6000 deg. Period: 91.60 min. ISS EO-24 crew. The return to earth was reported advanced four days to avoid coinciding with an OSCE conference in Kazakhstan. The crew undocked from the Rassvet module of the ISS at 01:23 GMT on 26 November 2010. There was a leak in the descent module, but ground controllers concluded the return to earth could be conducted safely. The Soyuz made its deorbit burn at 03:55 GMT and landed safely in Kazakhstan at 04:46 GMT.

2010 June 30 - . 15:35 GMT - . Launch Site: Baikonur. Launch Complex: Baikonur LC1. LV Family: R-7. Launch Vehicle: Soyuz 11A511U. LV Configuration: Soyuz 11A511U s/n 1758.
  • Progress M-06M - . Mass: 7,250 kg (15,980 lb). Nation: Russia. Agency: RKA. Program: ISS. Class: Manned. Type: Manned logistics spacecraft. Flight: ISS EO-24; ISS EO-23. Spacecraft: Progress M. Duration: 67.86 days. Decay Date: 2010-07-14 . USAF Sat Cat: 36748 . COSPAR: 2010-033A. Apogee: 361 km (224 mi). Perigee: 350 km (210 mi). Inclination: 51.6000 deg. Period: 91.60 min. First docking attempt with the ISS on 2 July aborted due to radio interference. Successfully docked with the ISS at the Zvezda module on 4 July at 16:17 GMT. Undocked from the Zvezda module of the ISS at 11:21 GMT on 31 August 2010. Conducted experiments in free flight until deorbited at 12:13 GMT on 6 September.

2010 July 27 - .
  • EVA ISS EO-24-1 - . Crew: Yurchikhin; Korniyenko. EVA Type: Extravehicular activity. EVA Duration: 0.28 days. Nation: Russia. Program: ISS. Flight: ISS EO-24; ISS EO-23. Summary: Prepared Rassvet module to allow future Russian vehicles to dock using Kurs automated rendezvous system capability. Routed and mated command and data handling cables on Zvezda and Zarya modules..

2010 August 7 - .
  • EVA ISS EO-24-2 - . Crew: Wheelock; Caldwell. EVA Type: Extravehicular activity. EVA Duration: 0.34 days. Nation: USA. Program: ISS. Flight: ISS EO-24; ISS EO-23. Summary: Attempt to replace an ammonia pump module of the station cooling system on the S1 truss failed due to a quick disconnect being stuck..

2010 August 11 - .
  • EVA ISS EO-24-3 - . Crew: Wheelock; Caldwell. EVA Type: Extravehicular activity. EVA Duration: 0.31 days. Nation: USA. Program: ISS. Flight: ISS EO-24; ISS EO-23. Summary: Removed failed ammonia pump on the S1 truss and began installation of replacement..

2010 August 16 - .
  • EVA ISS EO-24-4 - . Crew: Wheelock; Caldwell. EVA Type: Extravehicular activity. EVA Duration: 0.31 days. Nation: USA. Program: ISS. Flight: ISS EO-24; ISS EO-23. Summary: Completed installation of replacement ammonia pump of the station cooling system on the S1 truss..

2010 September 10 - . 10:22 GMT - . Launch Site: Baikonur. Launch Complex: Baikonur LC31. LV Family: R-7. Launch Vehicle: Soyuz 11A511U.
  • Progress M-07M - . Payload: Progress M-07M. Nation: Russia. Agency: RKA. Program: ISS. Class: Manned. Type: Manned logistics spacecraft. Flight: ISS EO-24; ISS EO-23. Spacecraft: Progress M. Duration: 163.00 days. Decay Date: 2011-02-20 . USAF Sat Cat: 37156 . COSPAR: 2010-044A. Apogee: 355 km (220 mi). Perigee: 350 km (210 mi). Inclination: 51.6000 deg. Period: 91.60 min. Summary: Docked at the Zvezda module of the ISS at 11:58 GMT on 12 September 2010. Undocked from Zvezda on 20 February 2011 at 13:12 GMT and deorbited over the Pacific at 16:12 GMT..

2010 October 7 - . 23:10 GMT - . Launch Site: Baikonur. Launch Complex: Baikonur LC1. LV Family: R-7. Launch Vehicle: Soyuz FG.
  • Soyuz TMA-01M - . Call Sign: Ingul. Crew: Kaleri; Skripochka; Kelly, Scott. Payload: Soyuz TMA-01M. Nation: Russia. Agency: RKA. Program: ISS. Class: Manned. Type: Manned spacecraft. Flight: ISS EO-25; ISS EO-24. Spacecraft: Soyuz TMA. Duration: 159.78 days. Decay Date: 2011-03-16 . USAF Sat Cat: 37183 . COSPAR: 2010-052A. Apogee: 355 km (220 mi). Perigee: 350 km (210 mi). Inclination: 51.6000 deg. Period: 91.60 min. Summary: ISS EO-25 crew. The Soyuz docked at the Poisk module of the ISS at 00:01 GMT on 10 October. The crew entered the spacecraft and undocked at 04:27 GMT on 16 March 2011. Following retrofire and re-entry they landed safely in Kazakhstan at 07:53 GMT..

2010 October 27 - . 15:11 GMT - . Launch Site: Baikonur. Launch Complex: Baikonur LC1. LV Family: R-7. Launch Vehicle: Soyuz 11A511U.
  • Progress M-08M - . Nation: Russia. Agency: RKA. Program: ISS. Class: Manned. Type: Manned logistics spacecraft. Flight: ISS EO-25; ISS EO-24. Spacecraft: Progress M. Duration: 88.59 days. Decay Date: 2011-01-24 . USAF Sat Cat: 37196 . COSPAR: 2010-055A. Apogee: 355 km (220 mi). Perigee: 352 km (218 mi). Inclination: 51.6000 deg. Period: 91.60 min. Summary: Undocked from the Pirs module of the ISS at 00:42 GMT on 24 January 2011 and deorbited over the Pacific at 05:16 GMT the same day..

2010 November 15 - .
  • EVA ISS EO-25-1 - . Crew: Yurchikhin; Skripochka. EVA Type: Extravehicular activity. EVA Duration: 0.27 days. Nation: Russia. Program: ISS. Flight: ISS EO-25; ISS EO-24. Summary: Removed and installed various equipment items and experiments on the exterior of the Russian Zvezda, Poisk, Zarya, and Pirs modules..

Home - Browse - Contact
© / Conditions for Use