STS-115A home
topic index

Jett

Ferguson

Tanner

Burbank


MacLean

Stefanyshyn-Piper

23 May 2003 00:00 GMT. (Cancelled flight). Other Name: ISS-12A. Crew: Jett, Ferguson, Tanner, Burbank, MacLean, Stefanyshyn-Piper. Program: ISS. Flight delayed after the Columbia disaster. STS-115 was to have flown a ten-day ISS Assembly mission ISS-12A. It would have delivered the second left-side truss segment (ITS P3/P4); a solar array; and batteries. The crew would first have attached the P3/P4 Truss to the first port truss segment (P1 Truss). Then they would have deployed solar array set 2A and 4A, activated and checked out the Solar Alpha Rotary Joint (SARJ), and deployed the P4 Truss radiator. The mission was finally flown in September 2006 .


STS-115A Chronology


Contact us with any corrections, additions, or comments.
Conditions for use of drawings, pictures, or other materials from this site..
To contact astronauts or cosmonauts.

© Mark Wade, 1997 - 2008 except where otherwise noted.