1967 January - First L-1 Zond spacecraft mated to Proton - Fit tests at Tyuratam. Not launched (Interavia SD)....
|
|
|
|
|
During 1967 - N1 development progress - The KORD system detected and controlled the parameters of 42 engines (30 first stage + 8 second stage + 4 third stage) This involved processing 1600 data elements....
|
|
|
|
|
5 January - Cosmonaut training status - Crews are in training for Voskhod, Soyuz, Lunar L-1, Almaz, and 7K-VI missions. There will be 100 cosmonauts in training by February. Meanwhile the Americans have conducted 10 manned flights since the last Soviet manned flight in March 1965. The cosm...
|
|
|
|
|
17 January - Manned space plans reviewed - At a meeting of the VPK Military-Industrial Commission and Chief Designers current manned space plans are reviewed....
|
|
|
|
20 January - Apollo S-IVB stage for Saturn launch vehicle 503 exploded - The Saturn 503 S-IVB stage exploded and was destroyed at the Douglas Sacramento, Calif., Test Facility at 4:25 p.m. PST during a countdown. The exercise had progressed to 10 seconds before simulated launch (about 8 minutes before S-IVB ignition) when...
|
|
|
|
|
27 January - 62 nations signed the Space Law Treaty - Representatives of 62 nations signed the space law treaty, "Treaty on Principles Covering the Activities of the States in the Exploration and Use of Outer Space, Including the Moon and Other Celestial Bodies," at separate ceremonies in Wash...
|
|
|
|
|
28 January - Apollo 204 Review Board established to investigate the AS-204 accident - The Apollo 204 Review Board was established by NASA's Deputy Administrator Robert C. Seamans, Jr., to investigate the Apollo 204 accident that had killed the 204 prime crew January 27. The Board would report to the NASA Administrator....
|
|
|
|
|
31 January - Funeral services for the Apollo 204 crewmen - Funeral services were held for the Apollo crewmen who died in the January 27 spacecraft 012 (Apollo 204 mission) flash fire at Cape Kennedy. All three were buried with full military honors: Virgil I. Grissom (Lt. Col., USAF), and Roger B. Chaffee (Lt...
|
|
|
|
|
31 January - Launch preparation for Apollo AS-501 to proceed as planned - A TWX from NASA Headquarters to MSC, MSFC, and KSC ordered checkout and launch preparation of AS-501 to proceed as planned, except that the CM would not be pressurized in an oxygen environment pending further direction. If AS-501 support, facility, o...
|
|
|
|
|
|
1 February - Government approves landing on moon by end 1968 - Soviet government approves plan to land cosmonaut on moon by end 1968. N-1 test plan approved, envisioning third quarter 1967 as beginning of flight hardware construction. Fall-back project would be manned circumlunar mission. First manned L1 missio...
|
|
|
|
1 February - Stop of all Apollo manned testing in high oxygen environments - MSC management directed contractors and other government agencies to stop all MSC-related manned testing in environments with high oxygen content....
|
|
|
|
|
|
4 February - UR-500K/L1 manned circumlunar design authorised. - Central Committee of the Communist Party and Council of Soviet Ministers Decree 115-46 'On the Progress of the Work on the Development of the UR500K-L1 --confirmation of schedule for piloted lunar missions' was issued....
|
|
|
|
|
4 February - L1/L3 launch schedules set - The following is the schedule set be decree for the L1 and L3 projects:
...
|
|
|
|
|
7 February - Cosmos 140 - After the self-destruction of the first Soyuz 7K-OK on re-entry, and the loss of the second one on the pad fire in December, the state commission ruled that the third 7K-OK model would be flown unpiloted on a solo mission. If this was successful then...
|
|
|
|
10 February - Apollo S-IVB stage explosion accident cause - The Board of Inquiry into the January 20 S-IVB-503 explosion at the Douglas Sacramento Test Facility identified the probable cause as the failure of a pressure vessel made with titanium-alloy parent-metal fusion welded with commercially pure titanium...
|
|
|
|
|
|
14 February - Fairing for OS space station authorised. - Ministry of General Machine Building (MOM) Decree 'On construction of the N1 payload fairing by the Khrunichev Plant' was issued....
|
|
|
|
|
5 March - Three Soviet subjects begin full year in closed-loop NEK Mars spacecraft simulator. - The Institute of Medical-Biological Problems (IMBP) and the Zvezda design bureau (designer of the ejection seat, space suits, and environmental control system for the Vostok spacecraft) became partners with OKB-1 in developing the SOZh closed-loop en...
|
|
|
|
8 March - Saturn V translunar payload 44,500 kilograms - NASA Associate Administrator for Manned Space Flight George E. Mueller stated that the February completion of MSFC studies of the Saturn V launch vehicle's payload and structural capability would permit an official revision of the payload from 43,100...
|
|
|
|
|
|
10 March - Cosmos 146 - Protoype Soyuz 7K-L1P launched by Proton into planned highly elliptical earth orbit. The first flight four-stage Proton rocket began assembly on 21 November 1966, with mechanical assembly completed by 29 November. Electrical connections and tests we...
|
|
|
|
|
12 March - Spiral and Soyuz training - Titov visits Kamanin on leave from test pilot duties at Vladimirovka. Titov will spend a year training as a test pilot on MiG-21, Su-7, and Su-9 aircraft. He flies well, and has matured and changed for the better over the last two years. Kamanin has ...
|
|
|
|
|
14 March - Lunar flyby/landing program plan reviewed - UR-500K/L1 project will consist of three phases. Phase I will be dedicated to development of the Block D translunar stage, using prototype, incomplete L1 spacecraft. Phase II will conduct lunar flybys with complete but unmanned L1 spacecraft. Phase I...
|
|
|
|
|
15 March - CIA reports on Soviet space developments - CIA reports accurately development of N-1, Almaz, Proton, etc.... even states 100,000 kg large space station in development for launch by N-1 by 1969. CIA does not expect lunar landing until early 1970's....
|
|
|
|
|
16 March - Soyuz state commission - The Soyuz 1/2 crews had planned to depart for Baikonur on 30 March, but Mishin wants to push this forward to the night of 17/18 March. This disrupts all of Kamanin's training plans and shows the poor planning and work of Mishin and his followers. A S...
|
|
|
|
20 March - Apollo-Saturn 204 launch vehicle to launch the first lunar module - NASA announced it would use the Apollo-Saturn 204 launch vehicle to launch the first lunar module on its unmanned test flight. Since the 204 vehicle was prepared and was not damaged in the Apollo 204 fire in January, it would be used instead of the o...
|
|
|
|
|
|
20 March - Soyuz 1 preparations - The cosmonauts have given up on further training at Baikonur due to the incomplete state of the spacecraft and returned to Moscow. Kamanin wanted to confront Mishin on the issue - this was all his fault, six days wasted - but Mishin never even showed...
|
|
|
|
|
22 March - L1 flight scenario undecided - Kerimov argued with Mishin that without any logical reason his demand that the cosmonauts go to the cosmodrome for training has disrupted their preparation schedule. Later Kamanin met with Gagarin, Leonov, Volynov, and Makarov, all selected as pilots...
|
|
|
|
|
23 March - L1 State Commission - A State Commission is held on the impending L1 translunar flights. A major issue is the L1 tracking/recovery radio beacon and the Zarya-3 deep space communications system. Launches of prototype L1P spacecraft are planned for April and May, with the f...
|
|
|
|
1967 March 25 - April 24 - Designations for Apollo / Apollo Applications missions - NASA Hq. Office of Manned Space Flight informed KSC, MSFC, and MSC of approved designations for Apollo and Apollo Applications missions:...
|
|
|
|
|
|
31 March - Soviet lunar maps prepared. - Kamanin examines maps of the moon, executed at scales of 1:5,000,000 and 1:10,000,000. 2000 are to be printed for use by the cosmonauts in preparation for the Soviet lunar landings. Mishin doesn't see the point - he is very aggressively anti-pilot fo...
|
|
|
|
|
1 April - Manual docking for Soyuz 1/2 - Ustinov reviews the cosmonauts. Kamanin urges that a manual docking be allowed on the Soyuz 1/2 mission - he had argued the same point with Korolev before his death. Komarov say he can accomplish a manual docking from 350 km range (once the Igla auto...
|
|
|
|
5 April - Apollo 204 Review Board final report - The Apollo 204 Review Board transmitted its final formal report on the fire to the NASA Administrator. The Board noted that the reliability of the CM and the entire system involved in its operation was a requirement common to both safety and mission ...
|
|
|
|
|
7 April - Joseph F Shea, appointed Deputy Associate Administrator - Joseph F. Shea, MSC Apollo Spacecraft Program Office Manager, was appointed NASA Deputy Associate Administrator for Manned Space Flight, with responsibility for technical aspects of the program....
|
|
|
|
|
|
8 April - Cosmos 154 - Protoype Soyuz 7K-L1 manned circumlunar spacecraft. There are high winds for the L1 launch, 15-17 m/s. The official limit is 20 m/s, but Chelomei wants to scrub the launch if winds go over 15 m/s. Nevertheless the launch proceeds in 17-18 m/s winds a...
|
|
|
|
|
12 April - Chaos at Area 31. - The cosmonauts began work at 10:30 in the morning, and didn't complete work until 23:30 at night. They spent 16 hours working on Cosmonaut's Day, due to the criminally chaotic performance of TsKBEM. The cosmonauts have to train simultaneously for the...
|
|
|
|
|
14 April - Huge blow-up at Tyuratam. - The cosmonauts are completely trained, ready for launch at any time with four hours notice. Then Mishin calls Ustinov and tells him that their training is what is holding up the Soyuz 1 launch! From the point of view of the military quality assurance...
|
|
|
|
|
16 April - Soyuz 1 is moved to the integration hall. - The Soyuz 2 crew trains from 15:00 to 20:00 - they had to wait due to problems with the spacecraft, but then the training went all right. The argument continues on whether to do an automatic or a manual docking. The design bureau wants to use the Igl...
|
|
|
|
1967 April 20-26 - Fire in the Bell Apollo LM ascent engine test facility - A fire broke out in the Bell Aerosystems Test Facility, Wheatfield, N.Y., at 2:30 a.m. April 20. Early analysis indicated the fire was started by overpressurization of the ascent engine's propellant- conditioning system, which caused the system relie...
|
|
|
|
|
|
20 April - Soyuz 1/2 State Commission. - 150 people attend. The readiness of the spacecraft and launch vehicles are confirmed. The final responsibilities and schedule are approved. Everything is go. Afterwards there is a meeting with Mishin. He is mainly worried about two things that could ...
|
|
|
|
|
23 April - Soyuz 1 - Space disaster that put back Soviet lunar program 18 months. Soyuz 1 as active spacecraft was launched first. Soyuz 2, with a 3 man crew would launch the following day, with 2 cosmonauts spacewalking to Soyuz 1. However immediately after orbital in...
|
|
|
|
|
24 April - Crash of Soyuz 1. Cosmonaut Vladimir Mikhailovich Komarov is killed at age 40. - The decision was made to bring Komarov back due to an undeployed solar panel which reduced electrical power and blocked orientation sensors. Re-entry was successful and the drag chute deployed. However due to a flaw during manufacture, the parachut...
|
|
|
|
|
26 April - Komarov state funeral. - Komarov's ashes are interred in the wall of the Kremlin....
|
|
|
|
|
27 April - State Commission on Soyuz 1 crash. - Ustinov convened the commission at noon. The work was to be completed by 15 May, and the final report issued by 25 May. The members of the commission would be Ustinov, Smirnov, Serbin, Afanasyev, the Chief Designers, and Gagarin. 22 members would wor...
|
|
|
|
|
29 April - L1 trainer review. - Review of progress on the L1 trainer MN-17, consisting of the SA and NO of the spacecraft It was built by the Factory Brigade headed by Darevskiy and was finished three to four weeks ago. But there is still the question of the cosmonauts conducting a...
|
|
|
|
2 May - NASA briefing to Manned Orbiting Laboratory staff on fire hazards - The Air Force Manned Orbiting Laboratory Systems Program Office requested that MSC present a briefing to selected office and contractor personnel on NASA's progress in safety studies and tests associated with fire hazards aboard manned space vehicles...
|
|
|
|
|
4 May - Apollo mission redesignations - Directions had been prepared to designate mission AS-501 formally as Apollo 4, AS-204/LM-1 as Apollo 5, and AS-502 as Apollo 6, NASA Apollo Program Director Samuel C. Phillips informed Associate Administrator for Manned Space Flight George E. Mueller...
|
|
|
|
|
|
5 May - Gagarin and Leonov want Mishin cited in Soyuz crash report. - Gagarin and Leonov meet with Kamanin. They discuss the complete inadequacy of Mishin - his excitability, poor knowledge of the Soyuz spacecraft and the details of its operation, his lack of cooperation in working with the cosmonauts in flight and tra...
|
|
|
|
|
6 May - Chief Designers favour direct L1 flight to the moon - Tyulin calls Kamanin. He reports that all of the Chief Designers are in favour of direct L1 flight to the moon instead of the earth orbit rendezvous method. However the Central Committee wants to see four consecutive successful unmanned flights, rath...
|
|
|
|
|
7 May - Soyuz return-to-flight plans. - Aboard Mishin's aircraft, he discusses his plans with Kamanin. He plans to launch two unmanned Soyuz spacecraft in the second half of July. An automated docking will be attempted, but the mission will be considered successful if the spacecraft rendez...
|
|
|
|
|
15 May - Soyuz parachute test results. - In the first drop, the reserve parachute didn't open. In the second test, it did inflate, but only after a delay of twenty seconds. TsAGI studies show the drogue chute is creating an area of turbulence in the wake of the capsule, and the reserve chut...
|
|
|
|
|
16 May - Cosmos 159 - The E-6LS was a radio-equipped version of the E-6 used to test tracking and communications networks for the Soviet manned lunar program. The payload entered the desired orbit as Kosmos-159....
|
|
|
|
20 May - Contract for three additional Apollo CSMs requested - MSC notified NASA Hq. that - with the changes defined for the Block II spacecraft following the January 27 Apollo 204 fire and with CSM delivery schedules now reestablished - it was necessary to complete a contract for three additional CSMs requested...
|
|
|
|
|
|
20 May - LII Soyuz parachute findings - The drop of the Soyuz 1 mock-up at Fedosiya was cancelled due to the great likelihood of loss of the spacecraft and the low likelihood of obtaining any new data as a result. The LII assessment of the parachute system has been completed:...
|
|
|
|
|
22 May - LII Soyuz parachute recommendations impractical. - The conclusions of the LII study are found to be sound, but it would take months or even years to implement such an extensive spacecraft redesign. Mishin is still under orders to fly a manned mission around the moon by the 50th Anniversary of the Rus...
|
|
|
|
24 May - NASA realigned its Apollo and AAP launch schedules following the Apollo 204 accident in January. - Because of the Apollo 204 accident in January and the resulting program delays, NASA realigned its Apollo and AAP launch schedules. The new AAP schedule called for 25 Saturn IB and 14 Saturn V launches. Major hardware for these launches would be two ...
|
|
|
|
|
|
26 May - Soyuz 1 Commission report is reviewed. - Afanasyev, Kerimov, and Tyulin object to Kamanin's conclusion that problems exist with the automated landing system and that a manual backup is needed. They want to find fault only with the parachute. The findings of VVS LII, and TsAGI are discussed...
|
|
|
|
|
29 May - Soviet of Chief Designers. - Tkachev, chief designer of parachute systems, rejects the findings of the Soyuz 1 state commission. His objections are overruled. The final decision is to adopt the conclusions of the commission in their entirety. Two unmanned Soyuz flights will take...
|
|
|
|
9 June - Selection of North American as Apollo prime contractor documented - Robert C. Seamans, Jr., Deputy Administrator of NASA, prepared a memorandum to the file concerning the selection of North American Aviation as the CSM prime contractor. The memorandum, a seven-page document, chronologically reviewed the steps that le...
|
|
|
|
|
9 June - Sequence of Apollo missions following the first manned flight - Robert O. Aller, NASA OMSF, told Apollo Program Director Samuel C. Phillips that considerable analysis, planning, and discussion had taken place at MSC on the most effective sequence of Apollo missions following the first manned flight (Apollo 7). Th...
|
|
|
|
|
|
15 June - First test of liquid hydrogen/LOX engine for N1M - First test of the 11D56 in an iron stand version. First test of an engine with these propellants in USSR for use in a space launch vehicle....
|
|
|
|
5 July - Fire that at White Sands Apollo Test Stand 403 - A board was appointed by MSC White Sands Test Facility Manager Martin L. Raines to determine the cause of a fire that had occurred at Test Stand 403 on July 3. The board was to submit its findings by July 17....
|
|
|
|
|
|
16 July - Soviet space setbacks - Kamanin observes in his diary that there will be no way a Soviet cosmonaut will fly in space in 1967 and blames it all on Mishin....
|
|
|
|
|
21 July - Soyuz spacecraft programme review is conducted. - Problems are identified with the parachutes and oxygen regeneration system which must be solved before the first manned flight....
|
|
|
|
|
24 July - Cosmonaut group meeting. - Mishin is seen as jeopardising Soviet manned lunar plans. He has no understanding of the necessity of providing proper training simulators to prepare the cosmonauts for flight. He is coarse, rude, doesn't listen to critics, and ignores the comments o...
|
|
|
|
25 July - Apollo lunar mapping and survey system terminated - Following a series of discussions on the requirements for the lunar mapping and survey system (LMSS), the effort was terminated. An immediate stop work order was issued to the Air Force, the Centers, and the contractors in the LMSS effort. The origin...
|
|
|
|
|
25 July - Apollo LM-2 options - MSC Director of Flight Operations Christopher C. Kraft, Jr., raised questions about lunar module number 2: Would it be possible for LM-2 to be a combined manned and unmanned vehicle; that is, have the capability to make an unmanned burn first and the...
|
|
|
|
|
|
29 July - Review of Soyuz trainer status. - The Soyuz simulator has not been functional for three months -- entirely the fault of Mishin and Tsybin. The L1 trainer has not been finished, and the autonomous navigation system has not completed development. There are two prototype electronic comp...
|
|
|
|
1 August - AS-208 - Before fire, planned in-orbit test of LM. CSM-101 would dock with and crew would maneuver together....
|
|
|
|
|
|
2 August - Manned spacecraft trainer status - The Volga and Soyuz trainers are to be finally operational on 10 and 20 August respectively. The L1 trainer is not progressing and the L3 trainer exists only on paper. The lead cosmonauts have decided to boycott Feoktistov. Nikolayev and Bykovskiy si...
|
|
|
|
|
8 August - Gagarin grounded. - The Soviet leadership has decided Gagarin is too important a propaganda asset to take any risks with his life. He is removed from the list of cosmonauts to be selected for space flights, and will be allowed to fly aircraft only with an instructor abo...
|
|
|
|
|
9 August - Gorbatko grounded. - Gorbatko shows heart abnormalities in his EKG during a run on the TBK-60 centrifuge....
|
|
|
|
|
14 August - Gulyayev grounded; Feoktistov in training. - Cosmonaut Gulyayev has hit his head on a stone when diving in the Kholodniy River. Feoktistov continues his attempt to complete 30 months of command cosmonaut training in 75 days. The makes ten dockings in the Volga trainer - 8 of the are rated as 'b...
|
|
|
|
|
15 August - L3 quarantine discussed. - Sterilisation and quarantine of the L3 spacecraft on its return from the moon is discussed....
|
|
|
|
24 August - Agreement on protecting the earth from contamination by Apollo samples - An interagency agreement on protecting the earth's biosphere from lunar sources of contamination was signed by James E. Webb, NASA; John W. Gardiner, HEW; Orville L. Freeman, Department of Agriculture; Stewart L. Udall, Department of Interior; and Fr...
|
|
|
|
|
|
24 August - Soyuz launch commission. - Over 200 recommendations were made for revision of the parachute system, and all of these had to be made over the last two to three months. There have been 30 drops of the FAB-3000 Soyuz capsule mass simulator and two drops of capsule mock-ups. The e...
|
|
|
|
|
27 August - Tass announces water landing exercises - Tass announces water landing exercises; Leonov involved....
|
|
|
|
|
31 August - N1 launch pad 110 east completed - ...
|
|
|
|
6 September - Apollo spacecraft weight situation serious - ASPO Manager George Low in a letter to Dale Myers of North American Aviation, emphasized that the spacecraft weight situation was the single most serious problem in the entire Apollo program....
|
|
|
|
|
7 September - LM-1 (Apollo 5) continued to have serious schedule difficulties - LM-1 (Apollo 5) continued to have serious schedule difficulties. However, all known problems were resolved with the exception of the propulsion system leaks. Leak checks of the ascent stage indicated excessive leaking in the incline oxidizer orifice ...
|
|
|
|
|
8 September - Reduced Apollo spacecraft delivery schedule approved by NASA HQ - A revised spacecraft delivery schedule with a maximum delivery rate of six spacecraft per year as opposed to a delivery rate of one spacecraft every six weeks for the Apollo program was proposed by MSC and approved by NASA Hq....
|
|
|
|
|
|
8 September - L1 Expert Commission. - Mishin certifies that the spacecraft will be delivered on 13-14 September, so launch is set for the window of 25-27 September. There are two recovery zones: Baikonur is the prime, with the Indian Ocean as secondary in case of a ballistic re-entry....
|
|
|
|
|
13 September - Smirnov told Feoktistov unready for command. - Vershinin writes a letter to Smirnov on the subject of Feoktistov. He tells Smirnov he is not ready to be a spacecraft commander....
|
|
|
|
16 September - Apollo CSM 017 guidance and navigation computer locked up - During operational checkout procedures on CSM 017, which included running the erasable memory program before running the low-altitude aborts, the guidance and navigation computer accidentally received a liftoff signal and locked up. Investigation was...
|
|
|
|
|
|
19 September - L1 Launch Commission. - The cosmonauts are training at Area 113, and the launch will be from Area 81. The State Commission meets from 15:00 to 18:30. So far there have been six successful Proton flights and only one failure. The Proton assembly was completed in 71 working d...
|
|
|
|
20 September - Proposed sequence of Apollo missions leading to a lunar landing mission - MSC proposed to the NASA Office of Manned Space Flight a sequence of missions leading to a lunar landing mission. The sequence included the following basic missions:...
|
|
|
|
|
|
20 September - Review of N1 progress. - The booster was supposed to be launched by 1966, but there is no way it will be finished this year, and it is highly questionable it will even get off the ground in 1968. The N1 tanks are pressurised to 2 atmospheres, and can go up to three atmospher...
|
|
|
|
|
21 September - L1 launch delayed to November. - The L1 in preparation at Area 31 will not be ready for the planned 20 October launch due to delays in qualification of the parachute system at Fedosiya. No launch attempt now expected until November....
|
|
|
|
22 September - Merger of North American Aviation and Rockwell-Standard - The merger of North American Aviation, Inc., and Rockwell-Standard Corp. became effective and was announced. The company was organized into two major groups, the Commercial Products Group and the Aerospace and Systems Group. The new company would be ...
|
|
|
|
|
|
26 September - L1 Launch Commission. - Proton s/n 229 and L1 s/n 4L are ready for launch. There remain communications problems, including the 3-channel telemetry and the SAS abort system. Launch is set for 28 September, landing after return from the moon on 4 October at 19:52, 200 to 300 ...
|
|
|
|
|
27 September - Soyuz 7K-L1 s/n 4L - First attempted circumlunar flight. The UR-500K failed, crashing 50 to 60 km from the launch pad. The L1 radio beacon was detected 65 km north of the Baikonur aerodrome by an Il-14 search aircraft. An Mi-6 helicopter recovered the capsule and had it...
|
|
|
|
28 September - Elimination of all flammables from the Apollo cabin not possible - In spite of efforts to eliminate all flammable materials from the interior of the spacecraft cabin during flight, it was apparent that this could not be completely accomplished. For example, silicone rubber hoses, flight logs, food, tissues, and othe...
|
|
|
|
|
3 October - Budgetary cutbacks reduced AAP lunar activity to four missions and Saturn V Workshops to 17 Saturn IB and 7 Saturn V launches. - NASA Hq issued a revised AAP schedule incorporating recent budgetary cutbacks. The schedule reflected the reduction of AAP lunar activity to four missions and of Saturn V Workshop activity to 17 Saturn IB and 7 Saturn V launches. There would be two W...
|
|
|
|
|
|
3 October - Mishin's errors means Kamanin will not see a Soviet man on the moon in his lifetime. - The moon landing has already been delayed three to four years due to the mistakes of Mishin. Kamanin feels his mortality, the limited number of years remaining in his life, and is furious that Mishin is wasting time when life is so short for everyone...
|
|
|
|
|
5 October - First public revelation of Soviet manned space hardware. - The statues are unveiled at the space monument in Moscow, in commemoration of the tenth anniversary of the launch of Sputnik. The opening also marks the first screening of a new film devoted to the Soviet space program, the first to publicly reveal t...
|
|
|
|
|
6 October - Soyuz parachute trials at Fedosiya. - They need to complete 70 drops, which normally would take five to six months. Mishin still insists that they be completed by 1 November. Three tests are made in one day, a record, including the drop of a Soyuz mock-up at 17:55 from an An-12. The para...
|
|
|
|
|
7 October - Soviet of Chief Designers - In Moscow, Mishin heads a meeting of all the Chief Designers (including Chelomei, Mishin, and Glushko). Glushko says that the last UR-500K failure was due to errors made during manufacture of an engine in 1965 at Factory 19 at Perm. Ustinov notes tha...
|
|
|
|
8 October - Abort of Apollo in the near-pad region would result in land impact - Because of wind conditions, an abort of the Apollo spacecraft from a Saturn V in the near-pad region would result in land impact. To ensure the maximum potential safe recovery of the crew during a near-pad abort, certain forms of preparation within t...
|
|
|
|
|
|
10 October - Lunar Soviet - The meeting is headed by Afanasyev. The first N1 will have a payload of only 76 tonnes, versus the 95 tonnes required for the L3 lunar landing complex. In order to land two cosmonauts on the moon, as the Americans are planning, a 105 tonne low earth ...
|
|
|
|
13 October - Ballute system for Apollo rejected - A proposal to use a Ballute system rather than drogue parachutes to deploy the main chutes on the Apollo spacecraft was rejected. It was conceded that the Ballute system would slightly reduce dynamic pressure and command module oscillations at main p...
|
|
|
|
|
|
15 October - Meeting on crew selections for the L3 program. - Attending are Kuznetsov, Gagarin, Khlebnikov. There are three training groups: Soyuz, L1, and L3. Mishin and the MOM are holding up further training of cosmonauts until the VVS agrees to accept Mishin's candidates from TsKBEM. In any case, Mishin's a...
|
|
|
|
|
16 October - Continued problems with Soyuz landing system tests. - A further test of the Soyuz landing system went all right, if you don't consider the fact that the 'Tor' altimeter triggered the braking system 3.3 seconds early. One certainly couldn't say, as a result of only these two successful tests, that the sy...
|
|
|
|
17 October - Four additional Apollo CSMs approved - NASA Hq. informed MSC that NASA Deputy Administrator Robert C. Seamans, Jr., had approved the project approval document authorizing four additional CSMs beyond No. 115A. MSC was requested to proceed with all necessary procurement actions required to ...
|
|
|
|
|
|
17 October - The return to flight of Soyuz is approved. - There have been many improvements and additional qualification tests conducted since the Soyuz 1 crash, notably to the parachute system. MAP, TsAGI, LII, and the VVS want the L1 to have a reserve parachute as well, but Mishin rejects the recommendati...
|
|
|
|
|
21 October - Lunar crew controversy rages. - First Mishin was pushing the 60-year-old Anokhin for spaceflight, now the invalid Feoktistov. Feoktistiov suffers from gastrointestinal ulcers. Tyulin and Kerimov are of one voice in the matter - this is not even a question that can be raised - sick ...
|
|
|
|
|
23 October - Soyuz launches delayed. - The Soyuz launches have been delayed two to three days because of rain. In any case a membrane in an orientation system propellant tank burst during fuelling of spacecraft number 6....
|
|
|
|
|
24 October - Soyuz launch commission - Soyuz launch commission is held at Area 31 at 17:00....
|
|
|
|
|
27 October - Cosmos 186 - Docked with Cosmos 188; first automated rendezvous and docking of two spacecraft. The dockings were timed to celebrate the 50th Anniversary of the October Revolution (in lieu of a succession of manned space feats that all had to be cancelled due to s...
|
|
|
|
|
29 October - Cosmos 188 launch scrubbed. - The Soyuz-B ('Baikal') launch was delayed to 30 October due to problems with the celestial navigation system aboard Cosmos 186. Later that day an N1-L3 review is held. The first launch vehicle will be completed in two to three weeks, but the launch c...
|
|
|
|
|
30 October - Cosmos 188 - Docking target craft for Cosmos 186, which achieved world's first automatic rendezvous on second attempt. Hard docking achieved but electric connections unsuccessful due to misallignment of spacecraft. Ion flow sensor failed and Cosmos 188 had to mak...
|
|
|
|
30 October - Apollo LM delivery schedule revisions - Confirming an October 27 telephone conversation, ASPO Manager George M. Low recommended to Apollo Program Director Samuel C. Phillips that the following LM delivery schedule be incorporated into official documentation: LM-2, February 5, 1968; LM-3, A...
|
|
|
|
|
30 October - Apollo Drop Test failure 84-1 - A parachute test (Apollo Drop Test 84-1) failed at EI Centro, Calif. The parachute test vehicle (PTV) was dropped from a C-133A aircraft at an altitude of 9,144 meters to test a new 5-meter drogue chute and to investigate late deployment of one of th...
|
|
|
|
|
|
31 October - Cosmos 186 landing. - Due to failure of a star tracker a guided lifting re-entry of 3-4 G was not accomplished. A ballistic re-entry of 7-8 G however resulted in a successful soft landing in the target zone. Rudenko's recovery crews demonstrated a lack of training. Ustino...
|
|
|
|
|
1 November - Cosmos 188 self-destructs during re-entry. - Mishin is drunk again at a critical mission phase. Afanasyev, Kerimov, and Tyulin all know about Mishin's drinking problem but do nothing. Meanwhile in orbit Soyuz-B's stellar navigation system has not functioned correctly (it hasn't worked on any So...
|
|
|
|
4 November - Apollo mission schedule for six flights in 1968 and five in 1969 - NASA announced an Apollo mission schedule calling for six flights in 1968 and five in 1969. NASA Associate Administrator for Manned Space Flight George E. Mueller said the schedule and alternative plans provided a schedule under which a limited numbe...
|
|
|
|
|
|
4 November - Manned Soyuz flight by May 1968? - Discussion on the Il-18 on the way back to Moscow from Tyuratam. Mishin thinks that a manned flight aboard Soyuz will be possible by April-May of 1968; the others don't think it can happen until the second half of the year....
|
|
|
|
|
5 November - Soyuz capsule recovery issues. - Kamanin meets with Rudenko. They go over the problems with the training of his recovery crews. They have three helicopters, 10 men, yet nobody could determine if a soft landing had occurred or not....
|
|
|
|
9 November - Apollo 4 - ...
|
|
|
|
|
|
13 November - Kamanin's thoughts on first Saturn V launch. - The first Saturn V and Surveyor 6 have been launched by the Americans. Kamanin catalogues why the Americans are beating them: bad organisation, on the parts of Ustinov, Smirnov, Pashkov, Malinovskiy, and Grechko; technical errors and an undisciplined...
|
|
|
|
|
14 November - N1-L3 moon landing schedule revised. - Decree 'On revision of the timetable for the N1-L3' was issued....
|
|
|
|
15 November - Payloads for Apollo AS-503 - MSC informed MSFC that it would provide the following payload flight hardware for the AS-503/BP-30 flight test: boilerplate 30 (BP-30, already at MSFC); spacecraft-LM adapter 101 and launch escape system (SLA-101/LES) jettisonable mass simulation; an...
|
|
|
|
|
|
16 November - State Commission on Cosmos 186/188. - Problems on the mission included excessive firing of the manoeuvring engine during rendezvous and docking, and failure of the stellar navigation systems. The systems still need work before a man's life can be risked. It is decided to conduct another ...
|
|
|
|
|
17 November - UR-500 launch vehicle version for military payloads authorised. - Central Committee of the Communist Party and Council of Soviet Ministers Decree 1070-363 'On approval of work on the UR-500 launch vehicle' was issued....
|
|
|
|
|
17 November - L1 cosmonauts to Baikonur. - Three VVS aircraft fly to Baikonur for the L1 launch. Passengers include Leonov and the 12 cosmonauts of the L1 training group....
|
|
|
|
|
18 November - L1 launch weather delays. - Bad weather at Baikonur. Low visibility and snow may delay the L1 launch. Kamanin rails against Mishin - he's a drunk, an authoritarian, etc. etc....
|
|
|
|
|
21 November - Cause of Proton failure in last launch. - Glushko at Baikonur. He reports the Perm factory is under close supervision - the engine that failed on the last launch was found to have resin in the main fuel line....
|
|
|
|
|
22 November - Soyuz 7K-L1 s/n 5L - The launch takes place at 00:07 local time (22:07 on 22 November Moscow time). Glushko, Chelomei, and Kamanin observe the launch from an observation point in -5 deg C weather. Three to four seconds after second stage ignition, the SAS pulls the space...
|
|
|
|
|
25 November - N-1 mockup 1M1 rolled out to launch pad - Stays on pad until 12 December for facilities checks. Photographed by US reconnsat on 11 December. 1M1 mockup scrapped in 1975....
|
|
|
|
1 December - Plans resulting from Apollo 4 mission - NASA Hq. announced that, as concurred in by the Center Apollo Program Managers, the following decisions, based on the results of the Apollo 4 mission, were firmly established:...
|
|
|
|
|
2 December - Designation Saturn IB approved - NASA Administrator James E. Webb approved the designation "Saturn IB" as the standard way of referring to that launch vehicle in public statements, congressional testimony, and similar materials, rather than "Uprated Saturn I."...
|
|
|
|
|
|
2 December - Lunar Soviet. - A panel headed by Afanasyev and Mishin reviews the readiness of the N1. The mock-up booster is to complete pad compatibility tests by 30 March 1968. The first launch is still supposed to take place in the second half of 1968. The launch of the Americ...
|
|
|
|
|
3 December - L3 trainer controversy. - Mishin wants only his organisation to build L3 trainers, not the VVS. A whole series of previously-unmentioned trainers and simulators are mentioned, included the Turbolet, a V-10 helicopter with a lunar cabin, etc. For the L3 simulator Mishin wants ...
|
|
|
|
8 December - Apollo drop test failed - An Apollo drop test failed at El Centro, Calif. The two-drogue verification test had been planned to provide confidence in the drogue chute design (using a weighted bomb) before repeating the parachute test vehicle (PTV) test. Preliminary information...
|
|
|
|
|
14 December - Apollo schedule decisions - Apollo Program Director Samuel C. Phillips wrote the manned space flight Centers of Apollo schedule decisions. In a September 20 meeting at MSC to review the Apollo test flight program, MSC had proposed a primary test flight plan including...
|
|
|
|
|
|
15 December - L3 issues - There is still no enabling resolution for the L3. Many meetings are held, discussing the L3, L3 trainers, and Feoktistov's assignment as a cosmonaut....
|
|
|
|
17 December - Apollo LM-5 window shattered during initial pressurization test - A LM test failed in the Grumman ascent stage manufacturing plant December 17. A window in LM-5 shattered during its initial cabin pressurization test, designed to pressurize the cabin to 3.9 newtons per square centimeter (5.65 pounds per square inch)...
|
|
|
|
|
19 December - Lunar Exploration Office established - NASA Hq. announced establishment of the Lunar Exploration Office within the Office of Manned Space Flight's Apollo Program Office. The new office, headed by Lee R. Scherer, merged program units directing Apollo lunar exploration and planning explorat...
|
|
|
|
|
22 December - First fire-in-the-hole Apollo LM test - The first fire-in-the-hole test was successfully completed at the White Sands Test Facility (WSTF). The vehicle test configuration was that of LM-2 and the test cell pressure immediately before the test was equivalent to a 68,850-meter altitude. All ...
|
|
|
|
|
|
27 December - Mishin to remain in charge until first L3 launches. - Afanasyev holds meetings on the L3 lunar expedition program. Kamanin recites Mishin's failings. Afanasyev replies that he has talked to Ustinov about it, but Ustinov will leave the current management in charge until N1 flight tests begin. If they are...
|
|
|