He has logged over 2,500 flight hours in more than 40 different aircraft and has over 300 shipboard, and 300 land based arrested landings.
Birth Place: Plainfield, New Jersey.
Status: Active.
Born: 1964.12.12.
Spaceflights: 2 .
Total time in space: 25.53 days.
Mission Specialists: Bachelor's degree in engineering, biological science, physical science or mathematics and minimum three years of related experience or an advanced degree. Vision minimum 20/150 uncorrected, correctable to 20/20. Maximum sitting blood pressure of 140/90. Height between 150 and 193 cm.. Of 25 Americans, eight pilots and 17 mission specialists.
Later, Reisman deactivated the COL EDR (European Drawer Rack) and PCDF EU (Protein Crystallization Diagnostic Facility Electronic Unit), concluding with some close-up imaging using the COL's VCA1 (Video Camera Assembly 1).
In preparation for the subsequent VSPLESK installation (which required turning off the BITS2-12 Onboard Telemetry Measurement System), FE-1 Kononenko supported TsUP-Moscow in deactivating the Elektron O2 generator. As part of the standard deactivation process the Elektron was purged with N2 (nitrogen), controlled from laptop. (Elektron will be reactivated on 5/29.) Additional Details: here....
(SONOKARD objectives are stated to (1) study the feasibility of obtaining the maximum of data through computer processing of records obtained overnight, (2) systematically record the crewmember's physiological functions during sleep, (3) study the feasibility of obtaining real-time crew health data. Investigators believe that contactless acquisition of cardiorespiratory data over the night period could serve as a basis for developing efficient criteria for evaluating and predicting adaptive capability of human body in long-duration space flight.) Additional Details: here....
(Garrett collected three 450 mL samples (for postflight microbial analysis) and two 750 mL samples (for postflight chemical analysis) from each of three ports (SRV-K hot, SRV-K warm, SVO-ZV) for return on STS-124/1J. The small amounts of water used for flushing the equipment were later reclaimed from the flush bag.)
CDR Volkov serviced the Russian BMP (Harmful Impurities Removal System), starting the "bake-out" cycle to vacuum on absorbent bed #2 of the regenerable dual-channel filtration system. The regen process will be terminated tonight at ~5:15pm EDT. Filter bed #1 was regenerated yesterday. (Regeneration of each of the two cartridges takes about 12 hours and is conducted only during crew awake periods.) Additional Details: here....
Flight Day 3 (FD3) of STS-124/1J. ISS crew work cycle today: wake 6:32am EDT; sleep 10:02pm.
STS-124/Discovery docked smoothly at the PMA-2 (Pressurized Mating Adapter-2) port at 2:03pm EDT, nine minutes behind timeline, in darkness (orbital sunset ~1:23pm), after successfully completing the RPM (R-Bar Pitch Maneuver) in daylight at ~1:08pm and arriving at +V-Bar (straight in front of ISS) at ~1:11pm. The station now hosts ten occupants again as Mission 1J is underway. (The combined crew is comprised of ISS CDR Volkov, FE-1 Oleg Kononenko, FE-2 Garrett Reisman, STS CDR Mark Kelly, PLT Ken Ham, MS1 Karen Nyberg, MS2 Ron Garan, MS3 Mike Fossum, MS4 Akihiko Hoshide (Japan), and MS5/FE-2-17 Greg Chamitoff who replaces Reisman as FE-2, as the latter returns on Discovery as MS-5.) Additional Details: here....
ISS crew work cycle remains unchanged: wake 6:32am EDT; sleep 10:02pm.
Arigato Gozaimasu! Congratulations, JAXA! There is Hope in space! At ~5:09pm EDT, the JPM (Japanese Pressurized Module) of the JEM 'Kibo' laboratory complex was opened and ingressed by Aki Hoshide and Karen Nyberg for the first time, joined later by the rest of the crew who clearly enjoyed the voluminous super laboratory. (Kibo is permanently attached at the Node-2 (Harmony) portside hatch since last night.)
FE-1 Oleg Kononenko performed the periodic (currently daily) checkout/verification of IP-1 airflow sensors in the various RS (Russian Segment) hatchways, including the DC1-to-Soyuz tunnel, and the FGB-to-Node passageway. (This is especially important when the ventilation/circulation system has to cope with a larger crew on board, currently ten persons, and one of the two Russian SKV air conditioners off (SKV-1).) Additional Details: here....
ISS crew work cycle shifted another 30 min to the left: wake-up 6:02am EDT; sleep 9:02pm (Shuttle crew 30 min later: 9:32pm).
Crew activities aboard the ISS centered on three major areas: (1) Initial deployment of JEM RMS (Japanese Experiment Module Robotic Manipulator System) activation & checkout, (2) JLP (JEM Logistics Pressurized Module) post-relocation outfitting (Part 1), (3) Preparations for EVA-3 & EV1/EV2 Campout.
Before breakfast, FE-2 Reisman & FE-2-17 Chamitoff collected a 'wet' saliva sample (the third for Greg) for the biomed experiment INTEGRATED IMMUNE (Validating Procedures for Monitoring Crew member Immune Function). (IMMUNE protocol requires the collection to occur first thing post-sleep, before eating, drinking and brushing teeth, and all samples are stored at ambient temperature. Along with NUTRITION (Nutritional Status Assessment), INTEGRATED IMMUNE samples & analyzes participant's blood, urine, and saliva before, during and after flight for changes related to functions like bone metabolism, oxidative damage and immune function to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. The strategy uses both long and short duration crewmembers as study subjects. The saliva is collected in two forms, dry and liquid. The dry samples are collected at intervals during the collection day using a specialized book that contains filter paper. The liquid saliva collections require that the crewmember soak a piece of cotton inside their mouth and place it in a salivette bag; there are four of the liquid collections during docked operations.) Additional Details: here....
Underway: Week 8 of Increment 17.
ISS crew work cycle shifted another 30 min. to the left: wake-up 5:02am EDT; sleep 8:02pm (Shuttle crew 30 min later: 8:32pm).
Crew activities aboard the ISS addressed five major areas: (1) IWIS Dedicated Thruster Firing, (2) JEM RMS Final Deployment, (3) R&R of two A/L BCMs (Airlock Battery Charger Modules), (4) JLP/JPM vestibule final outfitting plus JLP ingress, (5) crew media conference & photo.
For the biomed experiment INTEGRATED IMMUNE (Validating Procedures for Monitoring Crew member Immune Function), FE-2 Reisman collected a 'wet' saliva sample before breakfast while FE-2-17 Chamitoff collected his first dry saliva samples, five times during the day. (IMMUNE protocol requires the collection to occur first thing post-sleep, before eating, drinking and brushing teeth, and all samples are stored at ambient temperature. Along with NUTRITION (Nutritional Status Assessment), INTEGRATED IMMUNE samples & analyzes participant's blood, urine, and saliva before, during and after flight for changes related to functions like bone metabolism, oxidative damage and immune function to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. The strategy uses both long and short duration crewmembers as study subjects. The saliva is collected in two forms, dry and liquid. The dry samples are collected at intervals during the collection day using a specialized book that contains filter paper. The liquid saliva collections require that the crewmember soak a piece of cotton inside their mouth and place it in a salivette bag; there are four of the liquid collections during docked operations.) Additional Details: here....
JAXA/Japan to IMMT: 'Arigato Gozaimasu! This flight was 100% successful for the Kibo elements. Thank you to everyone involved for the excellent support in preparation and execution of this mission!'
ISS crew work cycle (now including Greg Chamitoff) shifted another 30 min. to the left: wake-up 4:32am EDT; sleep 7:32pm (Shuttle crew 30 min later: 8:02pm, now including Garrett Reisman).
Crew activities aboard the ISS stack addressed five major areas: (1) Waste water dump from the Orbiter, (2) installation of JEM RMS Backup drive system, (3) PAO event, (4) Crew Sayonara, (5) hatches closing & ODS leak check. Additional Details: here....