Educated Connecticut; Rensselaer; Houston-Clear Lake. Total EVA Time: 0.76 days. Number of EVAs: 3.
From 1993 until 1996, he worked as an ascent/entry Guidance and Procedures Officer (GPO) in Mission Control. An ascent/entry GPO has both pre-mission and real time Space Shuttle support responsibilities in the areas of onboard guidance, navigation, and targeting. During that time, he supported seventeen missions as a flight controller. In April 1996, Mastracchio was selected as an Astronaut Candidate. In August 1996, he started two years of training and evaluation. Successful completion of initial training will qualify him for various technical assignments leading to selection as a mission specialist on a Space Shuttle flight crew.
Birth Place: Waterbury, Connecticut.
Status: Active.
Born: 1960.02.11.
Spaceflights: 3 .
Total time in space: 39.66 days.
Mission Specialists: Bachelor's degree in engineering, biological science, physical science or mathematics and minimum three years of related experience or an advanced degree. Vision minimum 20/150 uncorrected, correctable to 20/20. Maximum sitting blood pressure of 140/90. Height between 150 and 193 cm.. 10 pilots and 25 mission specialists selected from over 2,400 applicants. 9 additional international astronauts.
Atlantis docked with the PMA-2 adapter on the International Space Station at 05:51 GMT on September 10. The orbiter's small RCS engines were used to gently reboost the station's orbit several times.
Astronauts Lu and Malenchenko made a spacewalk on September 11 beginning at 04:47 GMT. They rode the RMS arm up to Zvezda and began installing cables, reaching a distance of 30 meters from the airlock when installing Zvezda's magnetometer. Total EVA duration was 6 hours 21 minutes.
During their 12-day flight, the astronauts spent a week docked to the International Space Station during which they worked as movers, cleaners, plumbers, electricians and cable installers. In all, they spent 7 days, 21 hours and 54 minutes docked to the International Space Station, outfitting the new Zvezda module for the arrival of the Expedition One crew later this fall.
The Shuttle undocked from ISS at 03:44 GMT on September 18 and made two circuits of the station each lasting half an orbit, before separating finally at 05:34 GMT. The payload bay doors were closed at 04:14 GMT on September 20 and at 06:50 GMT the OMS engines ignited for a three minute burn lowering the orbit from 374 x 386 km x 51.6 deg to 22 x 380 km x 51.6 deg. After entry interface at 07:25 GMT, the orbiter glided to a landing on runway 15 at Kennedy Space Center with main gear touchdown at 07:56:48 GMT for a mission duration of 283 hr 11min.
During ascent a large chunk of external tank foam was observed to hit the underside of the orbiter. Examination in orbit using the robotic arm showed a hole in a heat shield tile that went down to the felt mounting pad. There was considerable press discussion of the danger, but as the mission drew to a close NASA decided that no lasting damage would be incurred during reentry to the orbiter structure, and called off a potential extra spacewalk to repair the tile.
Endeavour docked at the PMA-2 adapter on the Station at 18:02 GMT on 10 August; the hatches were opened at 20:04.
The 14036 kg of cargo broke down as follows:
Following successful completion of all cargo delivery and station assembly tasks, the crew returned to Endeavour on 18 August, undocking the next day at 11:56 GMT. Landing was moved up a day ahead of schedule because of concern a hurricane might force evacuation of the Houston Control Center on the originally-planned return date. Endeavour began its deorbit burn at 15:25 GMT on August 21 and lowered its orbit from 336 x 347 km to -28 x 342 km. It landed on runway 15 at Kennedy Space Center at 16:32 GMT. Landing mass was 100,878 kg.