July 1936 - Launch Site: Peenemuende. Launch Complex: -. Launch Pad: -. Launch Vehicle: A3, V-2. -
A4 wind tunnel tests Nation: Germany. The tests showed that the A3 configuration was unstable in flight and that it was going to take a lot of trial and error to identify the correct aerodynamic shape for the supersonic missile. Therefore the decision was taken to go slow on development of the A4 until tests with the A3 were complete. The 25 tonne thrust engine would also have to be built and proven in ground tests to determine its actual characteristics before a lot of effort was put into final design and construction of the rest of the rocket. So a series of test launches of the A3 to test the A4 control and guidance systems were undertaken, while Test Stand I at Peenemuende was prepared for tests of the 25 tonne engine.
References: 693.
1936 July 31 - Launch Vehicle: Goddard. Model: Goddard L-A. -
Flight of Goddard series L section A rocket Nation: USA. Apogee: 0.0600 km (0.0373 mi). Rocket achieved altitude 200 ft above 80-ft tower; duration 5 sec; landed 300 ft from tower. References: 482.
August 1936 - Launch Site: Peenemuende. Launch Complex: -. Launch Pad: -. Launch Vehicle: Paris Gun, V-2. -
Ground broken at Peenemuende Nation: Germany. First objective is development of the A4 strategic ballistic missile, later dubbed the V-2. The missile is to deliver a one tonne high explosive payload to double the range of the Paris Gun of World War I (250 km - the Paris Gun could deliver a ten kg, 21 cm diameter shell to 125 km range). To provide a reserve, the missile was designed for a 1500 m/s burnout velocity, which resulted in a 275 km range. Accuracy was to be 2 to 3 per mille, versus typical artillery shell accuracy of 4 to 5 per mille. These requirements indicated a 25 tonne thrust engine, powering a 12 tonne missile, with a 2100 m/s exhaust velocity, burning 8 tonnes of propellant in 65 seconds. The requirement to transport the missile by rail limited the diameter to 1.6 m, which in turn led to a 14 m length. Span with the detachable tail fins was 3.5 m. Several major issues had to be solved during development. The first was what wing and body shapes would be stable at supersonic velocities. Another was building adequate ground facilities for the intensive tests needed to develop the 25 tonne thrust motor. For this purpose a static test facility was built at Peenemuende capable of handling 100 tonne thrust motors, seen as the next step after the A4. Another major problem was developing high-capacity pumps to deliver the liquid oxygen at a temperature of -185 deg C.
References: 693.
1936 September 1 - -
Tsien Hsue-shen enters CalTech Nation: China. Program: Long March. Tsien Hsue-shen, at the urging of Theodore von Karman, begins graduate studies at the California Institute of Technology. He will continue there for nearly twenty years, first as a student, finally as the Goddard Professor, becoming one of the leading rocket scientists in the United States.
References: 31.
September 1936 - Launch Site: Peenemuende. Launch Complex: -. Launch Pad: -. Launch Vehicle: V-2. -
First supersonic wind tunnel. Nation: Germany. Following problems with testing of the A3 (a subscale version of the planned V-2) by Dr Hermann, Von Braun proposes to the Germany army that a supersonic wind tunnel be constructed at a cost he estimates as 300,000 Marks. Other parts of the Army are not supportive of the facility, but it is finally built, costing millions more than Von Braun estimated.
References: 693.
Contact us with any corrections, additions, or comments.
Conditions for use of drawings, pictures, or other materials from this site..
To contact astronauts or cosmonauts.
© Mark Wade, 1997 - 2008 except where otherwise noted.
|
|