|
STV
|
|
Class: Technology. Nation: Europe. Agency: ELDO(F7). Satellite Test Vehicle. Mass: 249 kg (548 lb). Associated Launch Vehicle: Europa. STV Chronology
- 1969 July 2 - Europa F-8 / STV 2 - Launch Site: Woomera. Launch Vehicle: Europa. FAILURE: Third stage failed. Apogee: 300 km (180 mi).
- 1970 June 12 - Europa F-9 / STV 3 - Launch Site: Woomera. Launch Vehicle: Europa. FAILURE: Payload fairing failed to seperate. Apogee: 2,000 km (1,200 mi).
Bibliography and Further Reading
- Bramscher, Robert G, Spaceflight, "A Survey of Launch Vehicle Failures", 1980, Volume 22, page 351.
|
Contact us with any corrections, additions, or comments.
Conditions for use of drawings, pictures, or other materials from this site..
To contact astronauts or cosmonauts.
© Mark Wade, 1997 - 2007 except where otherwise noted.
|
|
|
|