Encyclopedia Astronautica
1965.11.08 - General constraints for Apollo missions AS-206 and AS-207


The development mission planning panel met to discuss the general constraints for missions AS-206 and AS-207.

AS-206 spacecraft and operational constraints and mission rules were checked for compatibility. An investigation of the AS-207 preliminary mission profile showed that the ascent power requirements far exceeded the capacity of the ascent stage batteries. A modification to the mission profile was developed which would enable the mission objectives to be accomplished within the LEM battery capabilities. A tentative procedure for negotiating MSFC launch vehicle constraints was established between MSC and MSFC.

More... - Chronology...

Home - Browse - Contact
© / Conditions for Use