Encyclopedia Astronautica
Lunar base


Category of spacecraft.

More... - Chronology...


Associated Spacecraft
  • Horizon Lunar Outpost American manned lunar base. Study 1959. In 1959 the US Army completed a plan for a manned military outpost on the moon. More...
  • Apollo Lunar Landing American manned lunar expedition. Begun in 1962; first landing on the moon 1969; sixth and final lunar landing 1972. The project that succeeded in putting a man on the moon. More...
  • KLE Complex Lunar Expedition Russian manned lunar base. Chelomei's design for a lunar base, studied 1964 to 1974 as a UR-700-launched predecessor or alternative to Barmin's DLB. More...
  • L3 Russian manned lunar expedition. Development begun in 1964. All hardware was test flown, but program cancelled in 1974 due to repeated failures of the project's N1 launch vehicle. More...
  • Project Selena American manned lunar base. Study 1964. Bono's enormous ROMBUS booster could fly all the way to the lunar surface and back if low Earth orbit rendezvous and propellant transfer were used. He therefore proposed using the booster to establish a lunar base. More...
  • AES Lunar Base American manned lunar base. Cancelled 1968. AES (Apollo Extension Systems) was planned as the first American lunar base. It would involve minimal modification of Apollo hardware. The Apollo CSM would be modified for long duration lunar orbit storage. More...
  • ALSS Lunar Base American manned lunar base. Cancelled 1968. The ALSS (Apollo Logistics Support System) Lunar Base would require a new development, the LM Truck, to allow delivery of up to 4100 kg in payload to the lunar surface. More...
  • DLB Lunar Base Russian manned lunar base. Substantial development activity from 1962 to cancellation in 1974. The N1 draft project of 1962 spoke of 'establishment of a lunar base and regular traffic between the earth and the moon'. More...
  • Lunar Exploration Program 1968 American manned lunar base. Cancelled 1968. In January 1968, Bellcomm, NASA's Apollo project management advisor, proposed a four-phase program for exploration of the lunar surface using Apollo and Apollo-derived hardware. More...
  • LESA Lunar Base American manned lunar base. Cancelled 1968. LESA (Lunar Exploration System for Apollo) represented the ultimate lunar base concept studied by NASA prior to the cancellation of further Saturn V production in June 1968. More...
  • L3M Russian manned lunar base. Study 1970-1972. Follow-on to the L3, a two N1-launch manned lunar expedition designed and developed in the Soviet Union between 1969 and 1974. More...
  • LEK Lunar Expeditionary Complex Russian manned lunar base. Cancelled 1974. Although the N1, L3, and DLB projects were cancelled, Glushko still considered the establishment of a moon base to be a primary goal for his country. More...
  • JSC Moon Base 1984 American manned lunar base. Study 1984. In 1984 a Johnson Space Center team lad by Barney Roberts took NASA's first look at a return to the moon after the shuttle was in service. More...
  • Outpost on the Moon American manned lunar base. Study 1987. Former astronaut Sally Ride was asked to head a task force to formulate a new NASA strategic plan in August 1986. More...
  • Energia Lunar Expedition Russian manned lunar base. Study 1988. In 1988, with development of the Buran space shuttle completed, Glushko ordered new studies on a lunar based that could be established using the Energia booster. More...
  • Lunar Evolution Base 1989 American manned lunar base. Study 1989. In August 1989 NASA's Office of Exploration completed a two-year, NASA-wide plan for future manned space exploration. More...
  • First Lunar Outpost American manned lunar base. Study 1992. The First Lunar Outpost was a very comprehensive moon base study carried out by NASA's Office of Exploration in 1992. More...
  • Early Lunar Access American manned lunar base. Study 1993. Early Lunar Access (ELA) was a "cheaperfasterbetter" manned lunar mission study, carried out by General Dynamics in 1992-93. More...
  • Lunox American manned lunar base. Study 1993. The NASA/JSC LUNOX proposal of 1993 tried to reduce the cost of maintaining a First Lunar Outpost by producing liquid oxygen propellant for the return to Earth from lunar soil. More...
  • LANTR Moon Base American manned lunar base. Study 1997. Liquid oxygen mined from the moon combined with a LOX-Augmented Nuclear Thermal Rocket earth-to-moon shuttle to achieve dramatic reductions in launch requirements for a lunar base. More...
  • Chinese Lunar Base Chinese manned lunar base. Study 2025. Beginning in 2000, Chinese scientists began discussing preliminary work on a Chinese manned lunar base. More...
  • Lunex US Air Force manned lunar base. Studied 1958-1961. The final lunar expedition plan of 1961 was for a 21-airman underground Air Force base on the moon by 1968 at a total cost of $ 7.5 billion. More...

Associated Programs
  • DLB Long-Duration Lunar Base (Russian abbreviation). Soon after the beginning of the L3 project studies work also began on a lunar base to follow the initial single cosmonaut lunar landing. These studies were undertaken by Korolev's OKB-1 with Chief Designer Vladimir Pavlovich Barmin's GSKB SpetsMash (State Union Design Bureau of Special Machine-Building) as principal subcontractor. The project was known to SpetsMash as the 'Long-term Lunar Base' (DLB) and to OKB-1 as 'Zvezda'. Consideration was given to using the same elements in expeditions to other planets. Under the DLB studies SpetsMash defined purposes of the base, the principles of its construction, phases of its deployment and composition of its scientific and support equipment. More...
  • Horizon HORIZON was a 1959 US Army study to establish a military lunar outpost. According to the project plan, by the end of 1964, a total of 40 SATURN vehicles would have been launched to assemble the necessary spacecraft and infrastructure in low earth orbit. Cargo delivery to the moon would begin in January 1965 with the first manned landing by two men in April 1965. The build-up and construction phase continued until the outpost would be manned by a task force of 12 men in November 1966. More...
  • LEK After the N1-launched Zvezda project was cancelled, the new head of NPO Energia, Glushko, still considered the establishment of a moon base to be a primary goal for his country. While the Americans had achieved the first moon landing, it was known that all moon flights after Apollo 17 had been cancelled. There existed an opportunity, through establishment of a permanent moon base, to steal the lead in the space race once again. Furthermore, analysis of the results of the previous unmanned and manned indicated that the moon was suited for a variety of 'special investigations', and that a permanent lunar expeditionary complex (LEK) would be required to accomplish this. More...

Home - Browse - Contact
© / Conditions for Use