1966 Fall. (Cancelled flight). Program: Apollo. NASA originally planned to fly four early manned Apollo spacecraft on Saturn I boosters. The decision was made to conduct all Apollo CSM tests on the more powerful Saturn IB booster. These flights were cancelled in October 1963, before crews were selected. This series of four partial-system lightweight Apollos would have run from fall 1965 to the end of 1966, concurrent with the Gemini program. Apollo SA-14 Chronology
|