Skylab 5


Brand

Lind

Lenoir

1974 April. (Cancelled flight). Crew: Brand, Lind, Lenoir. Program: Skylab. After completion of the three programmed Skylab flights, NASA considered using the remaining backup Saturn IB and Apollo CSM to fly a fourth manned mission to Skylab. It would have been a short 20 day mission - the CSM systems would not have been powered down. Main objective would be to conduct some new scientific experiments and boost Skylab into a higher orbit for later use by the shuttle. The marginal cost of such a mission would have been incredibly low; but NASA was confident that Skylab would stay in orbit until shuttle flights began in 1978 - 1979. But the shuttle was delayed, and faster atmospheric decay than expected resulted in Skylab crashing to earth before the first shuttle mission was flown.


Skylab 5 Chronology

  • - 1974 April - Skylab 5 (cancelled)  Crew: Brand, Lind, Lenoir. Spacecraft: Apollo CSM.

    After completion of the three programmed Skylab flights, NASA considered using the remaining backup Saturn IB and Apollo CSM to fly a fourth manned mission to Skylab. It would have been a short 20 day mission to conduct some new scientific experiments and boost Skylab into a higher orbit for later use by the shuttle. But NASA was confident that Skylab would stay in orbit until shuttle flights began in 1978 - 1979. But the shuttle was delayed, and Skylab crashed to earth before the first shuttle mission was flown.


Bibliography and Further Reading
  • Oberg, James, and Cassutt, MIchael, Spaceflight, "Phantom Space Crews", Vol 26, June 1984, p. 274.
 
 
 
 
 
 
 
 
 

Contact us with any corrections, additions, or comments.
Conditions for use of drawings, pictures, or other materials from this site..
To contact astronauts or cosmonauts.

© Mark Wade, 1997 - 2007 except where otherwise noted.

 
Encyclopedia Astronautica
topic index
0 - A - B - C - D - E - F - G - H - I - J - K - L - M - N - O - P - Q - Ra - Re - Sa - Sf - Sp - T - U - V - W - X - Y - Z