STS-119A


Lindsey

Kelly Mark

Gernhardt

Noriega

Padalka

Fincke

Kononenko O D

15 January 2004 00:00 GMT. (Cancelled flight). Other Name: ISS-15A. Crew: Lindsey, Kelly Mark, Gernhardt, Noriega, Padalka, Fincke, Kononenko O D. Program: ISS. Flight delayed after the Columbia disaster. STS-119 was to have flown ISS Assembly mission ISS-15A. It would have delivered the fourth and final set of U.S. solar arrays along with the S6 fourth starboard truss segment. The crew would have relocated the P6 Truss from atop the Z1 Truss to its final assembly location attached to the P5 Truss (becoming the final port-side truss segment). The would then redeploy and activate the P6 Truss Channel 2B and 4B solar arrays. The misson would also have delivered the EO-9 crew (Padalka, Fincke, Kononenko) to the station and returned the EO-8 crew (Foale, McArthur, Tokarev) to earth.


STS-119A Chronology

 
 
 
 
 
 
 
 
 

Contact us with any corrections, additions, or comments.
Conditions for use of drawings, pictures, or other materials from this site..
To contact astronauts or cosmonauts.

© Mark Wade, 1997 - 2007 except where otherwise noted.

 
Encyclopedia Astronautica
topic index
0 - A - B - C - D - E - F - G - H - I - J - K - L - M - N - O - P - Q - Ra - Re - Sa - Sf - Sp - T - U - V - W - X - Y - Z