 | Shaheen 1
| Intermediate range ballistic missile. Year: 1999. Family: Long March. Country: Pakistan. Other Designations: Hatf 4. Pakistani missile, apparently a license-assembled Chinese DF-15. Flown in October 2002, project managed by Pakistan Atomic Energy Commission. Launches: 4. Failures: 1. Success Rate: 75.00%. First Launch Date: 1999-01-15. Last Launch Date: 2002-10-08. Launch data is: incomplete. Apogee: 100 km (60 mi). Total Mass: 6,200 kg (13,600 lb). Core Diameter: 1.00 m (3.20 ft). Total Length: 9.10 m (29.80 ft). Shaheen 1 Chronology 1999 Jan 15? - Launch Site: Sonmiani. Launch Vehicle: Shaheen 1. FAILURE: Failure. - Test mission Nation: Pakistan. Agency: Pakistan. References: 1823.
1999 April 15 - 04:58 GMT - Launch Site: Sonmiani. Launch Vehicle: Shaheen 1. - Test mission Nation: Pakistan. Agency: Pakistan. Apogee: 100 km (60 mi). References: 1823.
2002 October 4 - 02:30 GMT - Launch Site: Sonmiani. Launch Vehicle: Shaheen 1. - Test mission Nation: Pakistan. Agency: Pakistan. Apogee: 100 km (60 mi). References: 1823.
2002 October 8 - Launch Site: Sonmiani. Launch Vehicle: Shaheen 1. - Test mission Nation: Pakistan. Agency: Pakistan. Apogee: 100 km (60 mi). References: 1823.
2006 November 29 - Launch Site: Sonmiani. Launch Vehicle: Shaheen 1. LV Configuration: Shaheen 1 s/n Haft-4. - Nation: Pakistan. Agency: Pakistan. Apogee: 100 km (60 mi). Test References: 2.
Bibliography and Further Reading - McDowell, Jonathan, Jonathan's Space Home Page, Harvard University, 1997-present. Jonathan McDowell's complete on-line listing of all objects orbited and over 20,000 rocket launches Accessed at: http://www.planet4589.org/jsr.html.
|